It has been a month of expectation and waiting.
Waiting for the vaccine to be available for COVID. Waiting for the vaccines to catch hold nationally so life can start to return to normal. Waiting for some HR changes at work to take effect. Waiting for (hopefully good!) feedback on several model railroad media fronts. Waiting for the book to arrive for sale. All of these things should be great when they come to be, but as my favorite musical artist sings: "The Waiting is the hardest part."
And so, as a place to ground out the energy and the angst in the waiting, I have continued to pour efforts into completing the deep staging installation, with a goal of having it operational by April 1. It has taken each minute I have given it, and asked for more: this is without question the most difficult construction I have tried on this layout.
We left off last time laying track for the tangent. That task was completed shortly after the last post while the tangent stretch was still on the floor of the space, allowing for track to be aligned where I could see it without having to guess.
Once the track cured, I installed all feeder wires, also here on the ground. You can see the gentle bend in the middle of the tangents, required to deal with the challenging clearances once installed. I added re-railer sections, upper right above, just in case. The black steel brackets you can see in the upper left will support this installation, which needs to be close to the aisle at the left side to avoid the diagonal supports ahead to the right. But, immediately past that, the roadbed will need to curve towards the wall to the left and begin the climb up to the Island level.
Many thanks to Tom S. and Ralph H. for coming over to lift, shift, and slide this assembly into place! We made the big lift - and it went just about perfectly. Thanks to measuring three times, cutting once, and the foresight to assemble this piece on the floor, we were in good shape.
The alignment was exactly what we needed. Clearances all checked out. I however left it loose on the brackets pending the installation of the curved section - since the curve will be the link to the existing layout, it must be finalized first. Now it was time to tackle the curved section installation.
I had been thinking the curve design and install over for months, debating the approach with myself and with Scott S., a fellow civil engineer. Like the tangent section, there was no way to lay track once the roadbed was installed just 10" below the top section. Worse, the tight curves required here (20" radius in places!) made precise installation critical. The trackwork needs to be perfect at all joints and respecting all clearances for trains to handle this - there is no room for error.
The new curved benchwork too would be too long and large to be slid in from the aisle or floor. It didn't clear the adjacent parts of the layout.
The only choice left was to paint the wood ahead of time, add the guardrails ahead of time, then assemble the curved plywood in two pieces, after which track could be laid - all while the assembly was temporarily supported out from under the top level. But the only place to do that was on top of the uneven mainline ramps behind Iroquois: it is the only place I could fit the assembly where it could then be rotated into position. Putting heavy plywood over HO scale mainline track is always tough to stomach. And then, after all that, the whole thing would need to be rotated counter-clockwise over the Island tracks, along its permanent path slid between existing Island tracks and the layer above, before being set down onto the supports.
Ugh. Lots of room for mistakes and collateral damage. BUT - a clear path forward, and frankly the only possible one.
Even the clear path forward had its struggles. Here I am in one of my 'layout yoga' positions, on a ladder on an angle bent over mainline with my head against the ceiling, laying track that had to be exact. Not fun.As the track cured, I double checked clearances again, even taking several of my longest locomotives and pushing them around the curve to ensure they cleared the sides and each other while on adjacent tracks. It was tight - but it worked! I weighted the track as seen above, a view where you can see the test engines too.
The final step was the final joint between the curve and the Island staging subroadbed, which I did with steel strips for extra rigidity at this odd joint. With both routes descending, there is a lot of torsion on these bars, but they are more than up to the task.
Thanks for providing this "step-by-step" on your model infrastructure improvement project that reflects major work from the "1-to-1" world.