Showing posts with label CP 277. Show all posts
Showing posts with label CP 277. Show all posts

Tuesday, May 16, 2023

The Grab Shot

 Sometimes, there's just a shot that catches the eye, and it's one that can really draw a viewer in.  


One of the amazing strengths today of scenic materials and the availability of photo backdrops is the ability to create a scene that truly can 'take you there.'  Here we have a westbound manifest train climbing towards the summit of Clark Hill on the Onondaga Cutoff, in a scene about 12" deep.  

It's similar to thousands and thousands of railfan grab shots - shots of interesting cars or loads, one that the photographer didn't necessarily plan but are worthy in the photographer's collection for the content alone.  This car is indeed worthy of note for the cooperation involved in its creation ( https://onondagacutoff.blogspot.com/2022/03/fillin-in-gaps.html ) and also as it was selected by Tony Koester for a recent 'Trains of Thought' column in Model Railroader magazine.

Each of those facts is itself a dream come true, and moments like these live on in memory.  The hobby these days is full of opportunity, perhaps more so than ever.  Just like a grab shot of a passing train, any moment can be worth remembering.

Friday, April 10, 2020

Final Detailing at CP 277

As these wild times continue, with the State, region and nation fighting the now-infamous corona virus and COVID-19, my days have been very interesting and unpredictable.  The maintenance and custodial crews I manage as part of my 1:1 railroad career have never been so important, nor fought a foe this invisible and difficult to stay safe from. 

While I still am 'on the property' in charge of the department that handles those things, I have a lot more time at home lately since each night and weekend, we have no plans.  So, I am making time to plow into the layout and finishing some long-standing projects.

 
One of those was to finally assemble and install the switch machines at CP 277.  This was one of the first interlockings I had installed.  The first few were installed on the basic foam roadbed I used across the railroad.  While very effective on normal track, the foam is too soft for turnouts:  the extra stress of moving points and avoiding those areas with glue means the spots that are glued tend to be less fixed than is optimal.

Ballast helped that tremendously, so I didn't need to redo it to support operations.  But, with the adjustments I had made, there were inconsistencies that required extra effort to overcome in finishing up the details. 

I started by adding extra ballast and installing the tie extensions to support the switch machines.  I used stained Micro-Engineering ties for this, cut to fit.  They were nestled into the new ballast and leveled carefully with a pair of tweezers before I soaked the whole new area of ballast and timbers with isopropyl alcohol and diluted white glue.   This was allowed to cure for 48 hours.

While I waited there, I moved ahead with cleaning up the Details West switch machine castings, and assembling the detail parts with the kit.


These parts are delicate but are beautiful models, very representative of what Conrail used on the Chicago Line in the 1990's.  I glued on the manual-throw arms and allowed them to cure overnight, and then used a spray of Rust-oleum charcoal gray primer as a paint coat.  This gives the look of the weathered black enamel used on the prototype. 


Upon trying the first location, the timbers still weren't quite stiff enough for my liking.  So, I added a bit more ballast and white glue as seen here.  The ballast is what I use for my Conrail mix - AR&M #1352, UP/SILVERTON/WP BOLD GRAY.  It's a dead ringer for ballast from the quarry that Conrail used on the Chicago Line and other lines in the northeast.  

The other locations set up nicely, and so I proceeded with adding those machines accordingly.  Once I finished those, I was able to add this last one.  


Now, with the final ballast profile and the machines in place, adjacent to Snooks Pond and the Highbridge Road grade crossing, this whole scene is really coming together nicely.  In fact, these last few projects have me ready to call this area complete.  I will add some details here and there but it is now time to move on to other areas.  The next major project is already nearly complete - check back soon for another big update and visual improvement!

Most importantly, though, stay safe and keep your mind set on keeping your family safe too.  The basics matter - on the railroad we are watching out for each other by wearing masks of any sort in public, which keeps others safe should we have the virus.  We are washing and cleaning constantly.  We are all in this together, and together we will stand to see it through.  Best wishes for Passover, Easter, or your choice of holiday!  May Peace be with all of us in this unprecedented experience.  

~RGDave

Wednesday, January 22, 2020

Hydrating Snooks Pond

Scenery along the main line of the Onondaga Cutoff near CP 277 has reached a point of completion where it is finally time to 'pour the water' into Snooks Pond. 

Snooks Pond, a small lake in Fayetteville, NY is one of the spots of my family's lore from Central New York.  The Deans moved all over New York State in the 1940's and 1950's as my grandfather's job with General Electric in the radar and sonar divisions moved from Syracuse to Schenectady, then to Syracuse again; then to Ridgewood NJ, then back to Syracuse.  During the Syracuse stays, the family lived in Fayetteville for a time in the 1940's, Ridgewood around 1952, and then settled in Skaneateles the second time in the mid 50's.  My mother tells the story of her younger brothers and the family dog building rafts for sailing on Snooks Pond during the early 1950's in Fayetteville, which were tested by the dog - and always sank.  The dog swam safety back to shore.  Snooks Pond would be a winter ice skating rink and fun park for the family - all in all, lots of nostalgia there.

When I laid out the route for the Onondaga Cutoff, following the geology and elevations through Rams Gulch along I-481, I noticed the alignment took us quite near Snooks Pond - and I smiled.  


I began by defining the area of the lake, and filling the terrain in to suit.  I masked off the areas I wanted to keep clean and mixed a batch of sculptamold to create the landmass.  


All contoured now and curing.


The area where the bungalow is for CP 277 has always struck me as awkward, with a narrow shelf for the bungalow.  This would have been a tower location on the original line, so I decided to add a retaining wall in the pond that would suggest a foundation for a former tower.  I filled in the back with sculptamold and shaped it to fit the look of eroded backfill.


As that cured, I cut clear plastic 'dams' for the area that will receive the pour of the two-part 'Enviro-Tex' epoxy that will be the base coat of the pond.  (I plan to add ripples to the surface later with a different product.)  The dam is sealed with caulk.


After the plaster cures, I painted it grimy brown-black and added static grass.


The final touches are a variety of plants around the edge of the pond, including swamp grass, cattails, bushes, and wild shrubs, from all sorts of sets I have collected from Scenic Express, MRC, and Noch.  

Now I will finish up those installations, paint the base and pour the water (GULP) - another permanent move that would be costly if I screw it up!

~RGDave

Friday, March 8, 2019

Protecting the Grade Crossing

After a push of late nights and dedicating a few larger blocks of time this month, the grade crossing at Highbridge Road is finally working, now protected with all lights and gates functioning as intended.  In all it was more than 30 hours of work time on the layout to get to this point - and the sounds have yet to be added!  That said I'd do it all again, because it adds so much to the scene.


This installation used the Azatrax kit, which I selected from several choices.  It is available from their web site http://www.azatrax.com/controller.html - my application required the add-on pair of detection circuits due to the double-track.  It's a great kit with very good instructions and all parts needed, including the assembled NJ International crossing gates.

From a planning standpoint, it was tough to visualize the details of how I could mount the boards and locate the infrared detection LED's.  Further, this was my first foray into infrared detection, and so there was a learning curve with those.  Approach circuits for grade crossings need to be located according to the fastest trains, so that the gates are down before the train comes across the road.  So, mine are located about 7 feet from the pavement allowing even 79-mph Amtrak to pass safely.  Lots to consider ahead of, and during, construction.

Major projects are a balancing act, and projects that require the track to be out of service during construction are even more of a challenge.   This project was a mix of planning, track work, electrical work, and all of it had to be done within the 10" of height between levels of the layout.  Given existing wiring for block detection, signals, and track power, and it is a tight fit.


Even with planning, there is just no way to avoid the 'rat's nest' of wiring as you get started with this unless you're doing it below the bottom level of the layout and you can get away with short detection circuits.  With 8 infrared detection pairs installed, each two with LED-style units with two wires each, that is 32 wires for detection alone - before even touching the lights!  

Different methods of detection exist. The Azatrax kit can use current-sensing block detectors, like my NCE BD20's - but only for the single-track installation.    For my set up the best choice was infrared, and using it as a 'reflective' setup allowed the sensors to be hidden in the roadbed. It is very important to include and wire only the sensors needed for your application - the instructions are key here.  The board is programmed for certain combinations of sensors for certain applications.  Here's how a final installation of reflecting infrared sensors appears from the top, looking down from about 7 feet:


And, here is how it looks from a standing position next to the layout:



Having this level of the layout built at 58" from the floor is an advantage here.  The installation is basically invisible from the eyes of most operators.  

Below, we can see more of how the sensors are aligned.  Here is a typical installation of the sensors, as seen from below the top level of the railroad:



Each of the white angled tubes contains one of the infrared LEDs or receivers, set up in a 'reflecting' mode so infrared light generated by the LED bounces off equipment once it passes overhead, and is seen by the receiver.  These holes were drilled through the track and finished ballast - not for the faint of heart!  Sharp drill bits helped as did a steady hand.

I tested the installations one by one with different equipment, moving rolling stock by hand over the sensors.  In several cases, my first installation was not reliable as I had set the pair too far apart.  The reflection did not work.  So, I had to re-set several of these, but was able to fill the non-used holes with ballast which made them disappear.  

The lighting was the most difficult part of the project.  The NJI crossing posts come with the primary LED lights wired, but no lights on the gates.  I elected to add three micro red LEDs to each gate, wired so that the last light is constant, but the two interior lights flash with the main LEDs.  The Azatrax board has terminals for each.  I drilled yet another hole for those wires (up to a total of 4 now, for each post) and ran them to terminal strips, which in turn were wired to the terminals on the board.  This was A LOT of work, all of it between the two levels of the layout in a tight spot.  

And, then two of the LEDs ended up not working on the rear gate - the wires had evidently moved too much and the connection broke.  So, I had to wire up two additional gate LEDs on the layout.  In frustration I took a photo from my awkward location with the tiny wires.  Not fun.


The final step was the gate motion.  The Azatrax board is wired to control Tortoise or similar switch machines and includes adjustments for speed control.  I drilled holes at a 30-degree angle per the instructions through the layout for the motion wire. The hard part is to locate the Tortoise below so as to reliably move the steel wire for the gates.  This took quite a bit of wrangling and adjustment, using all of my patience.  Again, though, it came together effectively.

Suddenly, then, I realized that I was finished - all that remained was to bundle the wires as best I could, and to clean up.  

Next time I'll post a video for you all of the actual action.  It's worth waiting for!

~RGDave

Friday, September 28, 2018

Expansive Scenes

In light of the invitation to present at the Mid Atlantic Railroad Prototype Meet (MARPM) earlier in September, Jack asked for a few images showing different blocks of trains on the Onondaga Cutoff.  I took an evening to arrange some shots and the results came back looking nice, so I thought I'd share a few here.

The RPM and our presentation went well - people were interested and it was well-received.  It is such a humbling thing to see our names next to those of so many guys who we looked up to for years.  I for one am glad to be able to give a little back to those that reached out to me!

The images....

First off, here is ML480, a big autorack and stack intermodal train that runs in the later evenings.


Next, here's the interchange run from NYS&W, the 'SY-1' job coming into Onondaga where the consist will terminate and return with outbound cars for Susquehanna.


A wide shot of NFSE (Niagara Falls, NY to Selkirk NY) coming through CP277.  He has autoracks up front and manifest behind.



And, playing with Photoshop a bit, here's a tighter crop of NFSE at CP277.  It is amazing how good these iPhones are now at shots like these.



It has been a busy time lately, with the RPM itself, work craziness, little kids at home, and all that goes with those things.  This is when the layout progress may slow but enjoyment can go up:  we can always run some trains, right?

Thanks for your reading this blog, and thanks for all the support!

~RGDave

Thursday, April 20, 2017

A Step Forward, Then Back, Then Forward Again

I've written here before of my ongoing focus on doing things once - not having to re-do projects due to mistakes or less-than-stellar work.   In a cumulative hobby like model railroading, progress of any sort adds up to great results, but having 'do-overs' sets us back.  Well, you win some, and you loose some.


Here's an image of ML-482 rolling downgrade in the morning through CP 277.  This past week I had to 're-do' the ditch light installation on the lead locomotive, Conrail SD50 6712.  One of the ditch lights had burned out.  Frustrating!  I opened the unit up and found that one of the wire leads had become entangled in the drive shaft, which had sheared it right off.  A simple fix, and a good reminder to tape wires out of the way of moving parts.

However, several hours later, the other light went out.  Now I'm getting really frustrated.  I decided to look at the manual, and thanks to Alex Lang's advice, learned that the resistors on LED lights will only support one LED.  I had wired both bright surface mount LEDs to the same resistor, and burned out the channel in the decoder.  No good!

Thankfully, JMRI's DecoderPro easily allows us to re-map functions to different buttons.  Since there were other light function channels that had not been affected by my mistake, I remapped the ditch lights to that function, and wired each LED to its own resistor.  A test showed we were good to go.

Here too are shots of ON14's power in Onondaga Yard:


And, a shot of the maintainer's view of the CP282 westbound signals, from the cat walk:


Sometimes, even our best intentions can still lead to mistakes, and in those cases we need to take a breath, learn from the mistake, and move on.  Lessons learned can be worth the cost of a mistake, and in this case there is no doubt.  As more ditch lights come to the fleet, this lesson will save me plenty of mistakes to come!

~RGDave

Tuesday, November 22, 2016

Depth at CP 277

It's not surprising that the look of the railroad changes so much with the addition of high-quality photo backdrops - to me, it's very rare that a painted backdrop looks better than a comparable photo backdrop.  Still, the degree of change from painted to photo in the case of the Onondaga Cutoff is amazing, and the shift in how the scenes now appear is adjusting some of the foreground ideas I have planned.


Here's a panoramic shot of train SEBU stretched out westbound, headed up the hill through CP 277. This is one of the most shallow scenes on the railroad, and yet with this backdrop completed, the eye is drawn to the train, even with no foreground scenery yet completed.  And this is just a quick snapshot!   This was going to be a simple scene along a flat swampy creek, but now it will be a superdetailed scene of its own.  It's a neat change!


Another nice development is that the backdrop has improved some of the longer shots along the railroad, such as here of that SEBU train coming towards CP 280 with the large Iroquois Paperboard plant in the background, with a backdrop of forest and sky.  Again, without any foreground scenery at all, this shot still 'pops' to my eye and will undoubtedly be better with ballast and scenery installed.


Finally, this one's for you, Phil -  had to have a model of the first car I owned, an '89 Dodge Caravan, on the railroad.  It certainly would have been trackside on the OC as much as it was the Chicago Line proper in the mid-90's!  Here it is with a model of my brother's '84 Chevy Caprice on the access road into CP 282.  Just another way to tie the model to the prototype!

Happy Thanksgiving to all you out there, best wishes into the Holiday Season.  This winter will be an exciting and dynamic time for the Onondaga Cutoff and I'll be reporting it here as time goes on!

~RGDave

Friday, March 22, 2013

Major Step Forward

I'm happy to provide some of the most significant news to date regarding the Onondaga Cutoff:  on Wednesday, March 20, the home signals at CP277 were cut in, and are now fully under computerized dispatcher control.  Here's a telephoto view of the new eastbound home signals:


And, enjoy this video of the first test run, an eastbound manifest freight, knocking down the eastbound 'clear' aspect on Track 2:







These are the first of many beautiful, custom signals I have ordered from Integrated Signal Systems in Florida.  ISS builds signals to your specifications, and I have found they are much more to scale than others on the market.  CP277 is the first of 6 interlockings and 3 intermediate signal locations to be cut in.  As the budget progresses and allows more signals to arrive, more cut-ins will follow.  It's a long term project - I am working to have the full railroad under computerized control, with manual options, by the end of 2013.

This project would simply not be possible if not for the help and guidance of those assisting me.  Like Rick helped so much with bench work 4 and 5 years ago, Alex, Jack, and Nick have been instrumental in operation and signal system design, and Nick deserves special mention for signals, as he has stepped in with this new layer of signal construction and installation.  There is plenty of work to come, and their help and enthusiasm is invaluable.

In a society that increasingly is obsessed with immediate satisfaction and quick rewards, I believe there is something to be said for grand visions and for the continual progress required to accomplish all that the vision defines.  Smaller steps over time perhaps call back to 'old hobbies' or a more simple society, but there is something natural about that:  Long-term projects involving numerous people working together over years, like the construction of the Onondaga Cutoff or that of a real railroad, hold a special energy.  Further, operating a railroad builds even more upon that same chord.  There is a sense of community that is only developed when people come together, working towards a common goal in construction, or in an efficient operation. In reflection, that energy is one of many reasons why I have always loved the railroad.  It's a journey.

Thanks for joining me on the journey!
~RGDave