Maintenance Modeling

We've touched on this before here, but one of the interesting parts of railroading that many modelers could emphasize more is modeling the maintenance crews that keep the railroad in good repair.  Every era has them, and with the evolution of mechanized maintenance as well as 'personal protective equipment' (PPE) and safety rules, including some maintenance can help set your era as well.

On the Onondaga Cutoff, Conrail uses custom machinery to help crews maintain track, signals, structures, bridges, and the right-of-way.  Thanks to some custom resin-cast truck cabs and masterful build jobs by my buddy Mark, and to the modification of several of Bachmann's HO scale ballast tamper and hi-rail utility truck, we can model track outages during some operation sessions which adds tremendously to the variety in the operation.


Here Foreman Lee is starting up the tamper, which was left overnight on blue-flag protected track in Onondaga Yard.  The boom truck will drive over in support of the tamper operation.  Ballast tampers on the prototype are used to groom and adjust the ballast beneath and around ties, keeping track level and the ride smooth for passing trains.


As the sun rises and the machine warms up, the crew gets set to head to the worksite.  This involves paperwork for permission to occupy track - a 'Form D' under the Conrail and 'NORAC' (Northeast Operating Rules Advisory Committee) rules, akin to a train order, since maintenance equipment cannot be relied upon to shunt signal systems.  These are normally given verbally via the radio, and it's fun to hear that conversation on the radio during a session - it adds nice variety and 'audible scenery' to the atmosphere.

Consider modeling some maintenance equipment for your railroad!

~RGDave 

Wednesday, August 29, 2018

Different Flavors of Railroading


All of us like to run trains, simulating real-life train movements.  However, one of the major issues in moving real-life trains is dealing with maintenance and infrastructure that is being worked on, either during preventive maintenance or repair.  One aspect of railroading that can be emphasized more on most layouts is maintenance of the right of way and infrastructure that supports operations.  


Here’s a photo of an actual infrastructure issue that occurred, and the subsequent repair that we chose to model during operations.   One of the switches on the west end ladder tracks in Onondaga Yard experienced a rod failure during the most recent operating session.  Rather than make a quick repair during the session, we locked the switch in one direction, simulating a ‘spike and block’ situation where crews mechanically fix a switch to prevent derailments due to a broken component. 

Once the sun came up, I placed one of my block truck models at the location with some figures to simulate the repair process.  After the session I made the repair – a careful application of Walthers ‘GOO’ adhesive did the trick, reconnecting the throw bar with the ground throw.  For this session, we will have the switch out of service for the first hour or so, allowing the track crew to finish their work – and adding some variety to the yardmaster’s job.

Modeling maintenance is a fun part of operations, and helps challenge operators to think outside the usual box of the job.  Where will the next repair be needed?  We will know when it happens – and we will deal with it, like they do on the prototype.

Thursday, June 15, 2017

Modeling Maintenance Of Way

A critical part of prototype rail operations on any railroad is 'maintenance of way' (MOW) - the employees that work to keep the track, signals, bridges, buildings, and electrical services in a state of good repair.  Railroaders don't just run trains, or man the towers and dispatcher desk.  My whole railroad career has in fact been on the maintenance side of the railroad, so I am familiar with the equipment and people that do this critical work.

As operations on the Onondaga Cutoff have matured we have added some MOW activity, taking tracks out of service for maintenance.  This adds variety and challenge to the sessions as well as providing a job for one or two guys.  Here is a photo essay of recent track maintenance at an operation session.


Early in the morning of Friday June 10, 1994, Track Supervisor Jacob is on his hi-rail pickup ahead of the ballast tamper, rolling east from Onondaga Yard into CP 280.   He has copied a 'Form D' - essentially a track warrant under the NORAC (Northeast Operating Rules Advisory Committee), authorizing him to be in charge of that track so that he can move the equipment to the work site.


Once the equipment is moved to the work site, it is joined by a fleet of other vehicles adjacent to the track that work together to repair the track structure, in this case by replacing ties and tamping the ballast to level the rails.  While the work occurs on Track 2, Track 1 is busy handling trains in both directions.  Here ML-403 comes upgrade around a boom truck and the ballast tamper doing their thing.


We turn to watch ML-403's locomotives blast past another boom truck laying out ties for spotting.


TV-13 works west later in the day behind three big GE's based out of Selkirk.  The engineer sounds the horn and rings the bell, following the rules, as he passes various maintenance vehicles and approaching CP 277.


After the work is complete, by late afternoon, the track gang has cleared up.  They give the track back to the dispatcher for use with a speed restriction for the first few trains over the freshly tamped area, then remove the restriction once the track has settled under the weight of revenue trains.   The gang ties up all their equipment back at Onondaga Yard and heads for a well-earned few beers at a local tavern!

Modeling the maintenance of the railroad is something we can all do at operating sessions to add variety and give some credit to the railroaders that few enthusiasts pay much attention to.


Monday, February 22, 2016

Maintenance-of-Way Operations

One of the more enjoyable parts of modeling an operation in a prototypical manner is that there is a natural variety built in, so long as we pay attention to the prototype.  For the Onondaga Cutoff, one of the better ways to do that is through modeling some of the maintenance practices followed by Conrail's track and "B&B" (Bridges & Buildings) gangs.


Here, we have Track Car T-5156 moving down Track 2 between CP282, in the background, and CP280 out of the photo to the right.  This is representing a track inspection, which by the 1990's was carried out in specially designed 'Hi-Rail' vehicles - essentially vehicles with standard frames and cabs, specially fitted bodies, and custom retractable railroad-wheel systems that allow the truck to drive on the rails.  In HO scale, motorized models are made by Bachmann, and one has been detailed and weathered for use during Operating Sessions now and again to represent prototype maintenance practices.

In each case, the driver of the track car will contact the dispatcher to copy a 'Form D' - a document that formally gives control of a segment of track to the driver.  The dispatcher will then mark that track out of service, and must route any trains around the work area.  It adds quite a bit of spice to an operating session!

~RGDave

Wednesday, June 10, 2015

Context, Details, and Maintenance Equipment

One of the things that working for a railroad can give you is lots of opportunity to observe the machines and people that make a railroad work - besides the trains!  While we all enjoy the trains themselves, the fact is that trains wouldn't roll if the property were not properly maintained.  Different departments work to maintain different aspects of the operation:  Track, 'B&B' (Buildings and Bridges), Signals, etc.

Scenery around the west end of Onondaga Yard has continued to progress.  With each small improvement, the context of the layout deepens.  Here's an overview of the scene at the big signal bridge supporting the westbound home signals for CP282, showing new ballast work, and the newly installed access road for the yard office:

And a quick snapshot of the signal bungalo for CP282, which has taken the place of the abandoned interlocking tower in the background:


In that first image, you can see a big knuckle-boom truck on the access road, headed towards the maintenance base that occupies some of the yard office area.  Built by my long-time buddy Mark in exchange for some weathering and DCC work, I only added some decals, window glass, and weathering to finish up his truck models for my fleet, each of which include scratchbuilt, resin-cast cabs, with kitbashed frames, wheels, and body.  

Here's a few shots of the current fleet at rest at the office.  First is a shot showing the rest of that area, which ends up being a good place to display the trucks behind the west end of the yard:


The trucks are not motorized, but are really beautiful models, with plenty of details!  Having a few of them fills a crucial role of adding important background for Onondaga Yard.  Most Conrail facilities would have a few trucks like these around, and Onondaga is no exception.  Here is a close-up of the boom truck:

 And finally, here is a close-up of the knuckle boom, the most recent and most intricate of the three models that Mark has delivered:

I am looking forward to getting more background and base scenery done, as it allows some of the real scenic detail work to begin in earnest.  All of that helps to set the feel of Conrail in the 1990's, as well as the feel of the area of Central New York that I am trying to convey.