Showing posts with label Collaboration. Show all posts
Showing posts with label Collaboration. Show all posts

Monday, July 11, 2022

"Meet the Modeler"

Our friends and creators over at Trains.com and Kalmbach Media have put together the next in their series of 'Meet the Modeler' articles online, and this month it's a fun question & answer about my modeling journey and the Onondaga Cutoff!


https://www.trains.com/mrr/news-reviews/news/meet-dave-abeles/

I will let the article do the speaking, but it's got a few tidbits that nearly everyone will learn for the first time.  Enjoy!


Thursday, March 24, 2022

Fillin' in the Gaps

 Modeling railroading at times is like going to a well-stocked supermarket.  You look around at the store, and there is some of just about everything you'd need to make a series of meals.  You can choose to go any direction you'd like, and as complicated a cooking project as you'd like.   The more time and energy you have, the larger project you can delve into.  And if time is at a premium you can do something small, that still serves to feed you.

Building, operating, maintaining, and sharing a large layout is a lot like that.  Amidst large projects like writing articles, preparing for and hosting operating sessions, and creating video content, it is refreshing sometimes to pick a few of those smaller projects to keep the ball rolling.  Any big project starts with a small step and I've had several in progress for months.  In that light, here's some recently completed projects!


For years I'd admired how people who were good at weathering could 'fade' the paint on models.  Sunlight naturally degrades paint on the prototype, and Conrail's blue tended to fade over time to a lighter shade.  On the new Tangent caboose from last month, I decided to give fading a try.  After the windows were masked I mixed up a diluted white overspray, and with the airbrush I sprayed the thinned white over the whole car.  The results for my first time were amazing!  I followed that up with my usual 'Burnt Sienna' brown overspray for the trucks and frame.

It dried overnight, and the following day I applied oils to simulate rust as well as Tamiya black and brown panel liner washes to bring out the detail.   That too cured and I dull coated the model before finishing with final oils and weathering chalks.  Upon removal of the window masks, I was thrilled - finally, I feel as though I am beginning to understand the fade technique, and the results really do make a difference!  

The other recent small project involves a pair of gondolas that have a story.  These are old 'Roller Bearing Models' resin kits donated by Tim Moses, assembled painted and decaled by Jerry D., and weathered by Lenny Harlos.  True teamwork cars!   The final piece missing was a good load, and thanks to this year's show at Springfield, UncaRalph H found a load manufacturer selling some wares.  

These are truly unique cars for the OC, and I am really excited to see them finally in revenue service.  The detail shots really blow my mind:


So, there's always something for everyone, and you can take what you want to make what you want.  Start something today, and finish it when you have the time and energy to do it.  Little by little, these things add up!


Thursday, May 13, 2021

Upgrading the Tower at CP 282

 A continuing vision for the Onondaga Cutoff is to 'Let Experts Be Experts.'   We've discussed that before, and it is manifested in different ways.  Skilled hands helped with benchwork.  Trusted advice from Model Railroader and Railroad Model Craftsman guided track installation and wiring.  Computer and IT experts helped me with networking.  Signal professionals did the signal design and guided the installation.  Transportation Planning professionals designed the car-forwarding and locomotive distribution systems, and design each operating session.  The list goes on, but it is clear that the total is much greater than the sum of the parts.

Recently, I had been searching for a suitable permanent model at CP 282 to represent an old NYC tower, repurposed as an office.  My vision was to model the tower that once stood at SJ interlocking, which became CP 293 under Conrail's tenure.  Al Tillotson, a talented modeler and regular operator on the OC, had contributed a foam-core and photo-printed stand-in that was suitable for its purpose for the last several years.  However, my goal was to model the brick and mortar construction from the 1930's as NYC upgraded its route through Syracuse.  


SJ was a critical interlocking that included not just the Water Level Route mainline but also the old Auburn Main, the Freight Bypass to the north, and the Lackawanna Oswego main line and interchange - plenty to keep the operator busy.   By the late 1950's though, NYC was installing new Centralized Traffic Control on its main routes, which allowed interlockings to be remote controlled from many miles away.  This made the tower operator and manual interlocking redundant.  The machinery was removed in the late 50's but the maintenance crews continued to use the tower as an office for decades to follow.  By the mid-90's, though, the end came and the structure was demolished.  

I worked with Perry Squier, a local modeler and expert scratch builder, to move forward.  Perry offered to build the tower if I could find plans.  Through the internet I came in contact with a former Conrail employee that - believe it or not - rescued the actual blueprints for this tower from a dumpster.  Amazed, I reported back to Perry who was surprised and pleased that we'd located the actual plans.  I made copies and Perry got to work.  


Perry asked that I do any interior detailing, which I did during a test-fit of the structure.  I also added lighting before returning the project for completion.  Perry delivered the final structure after several months of work, and I installed it on the layout - what an improvement!  

This adds a tremendous amount of NYC heritage and flavor to a scene that was already nearly complete.  The old tower was removed, and will be headed for my boy's layout in the attic, thanks to Al's generosity.  The new tower does an amazing job at night!

Another example of collaboration that turns out for the best: asking experts to help has made this layout greater than it could be if I were doing it myself. 

Thursday, February 18, 2021

Going Back, For the Future

Winter has arrived here in New Jersey, and with it more time for modeling and for working towards getting several projects moving forward on the Onondaga Cutoff.  

First among those is a new tower for CP 282, which has long been a goal of mine.  The stand-in, generously constructed by Al Tillotson from foam-core and prototype photos has worked well well for several years but a permanent replacement is needed.  Thanks to the internet I was able to track down the actual original New York Central (NYC) blueprints for the tower that stood at 'SJ' interlocking, on the boarder of Syracuse and Solvay, NY, until 1994.  In discussing the project with Perry Squier, a gifted modeler who also lives in northwestern NJ, I mentioned how it would be years before I could have time to do it.  Perry volunteered to help and build the tower so long as I did the interior detailing and lighting.  I am always up for collaboration, especially from experts!

Once Perry had the building constructed, I picked up the project to test fit it on the layout.  Since the prototype has a basement, installation required - gulp - cutting into finished scenery and subroadbed with a jigsaw.  Yikes!  


This is never a fun feeling.  I used some scraps of plywood to ensure I didn't destroy the track and signals in the area, and also made sure to tie the wires underneath this spot out of the way so that the saw didn't cut those, too.  

Cuts made, I could test fit the tower:


You can see the older stand-in in the back, which actually represents an abandoned version of a Hudson Division NYC tower in the 1980's.  The permanent structure will be built following Conrail practice to repurpose old towers in the 70's and 80's into field offices for maintenance of way personnel - so we're installing an older structure, but one that was still used in 1994.  With that in mind, the second floor office and workshop would be visible and especially at night.  Therefore interior detailing was in order.


It is time-consuming work, but a printed patterned floor to represent linoleum or asphalt tiles from the early 1960's along with a variety of industrial furniture, purchased from Shapeways.com as 3-D printed items, allowed me to represent a railroad office setting.  I painted and weathered all the details based on my own experience in such converted towers, and added LED lighting which will augment night operations.  Now the towers go back to Perry for roof and soffit installation before final install on the Onondaga Cutoff.  

As February 2021 has set in, we have a refreshing change of pace here in northwestern New Jersey in a stretch of good cold weather and regular snowfall.  The kids are amazed and enjoying it, and I am too.


It's been about 5 years since we have had more than a few inches at a time down here on the piedmont, and while the mountains and hills to the north and west have fared better for snow lovers it has been quite a while for even those spots to have weeks of accumulating snowfall.  This winter we have had snow on the ground now for close to three full weeks, which is a true winter feel and a pleasure to share with the kids.  

Finally, we have another Facebook Live event this coming weekend, Saturday February 20 at 9 p.m. Eastern.  Just head on over to the OC Facebook page to watch live with us, or to see it at a later time:  https://www.facebook.com/onondagacutoff/

Enjoy the winter weather, and I will be back soon with more progress on the Onondaga Cutoff!







Monday, October 19, 2020

Using Resources - Sharing the Knowledge

There has never been better time to be a researcher of railroad history, whether recent or long ago.  Never before has so much information been available to us so simply and at such a low cost in dollars or time.  When we consider how things are developing and all the difficult energy in the greater world, it is sometimes easy to forget the bright sides of the internet and social media.

A longtime friend, Ian Clark, has begun to post some photos of his time trackside in the 1990's to the internet.  Ian was a quick friend of mine during my time at Syracuse University and he took time to show me the ropes on NYS&W and Conrail in the area.  He's a gifted photographer and in sharing some of his 'just another day trackside' images, I can draw great information for the Onondaga Cutoff.


This is an Ian Clark image of NYS&W's SY-1, the Syracuse, NY based crew that handled interchange with Conrail and local road freight work in the area.   By 1995 they were doing their interchange at Dewitt Yard, using trackage rights over Conrail from their junction at CP 293 west of town to get on the main line.   

What a wealth of information here!  First, we have four units including a GP18, SD45, B40-8 and F45, all in the attractive 'yellowjacket' paint.  We have the train on the North Runner at Dewitt with the large engine service facility in the background, with various Conrail power being serviced as well as an entire 'camp train' for the track gang - the white trailers on flat cars.  


Later that morning, Ian captured SY-1 leaving Dewitt, this time at CP 286 on the Chicago Line in East Syracuse, NY.  They are coming west on the North Runner for their 6-mile run out to Solvay to regain their own track.  This shot reminds me that I need some code lines as seen on the left, and shows a nice mix of freight cars that confirms the current makeup of the train as modeled.

Both of these images, while familiar to me, were freshly reconsidered thanks to Ian's Facebook posts.  Having resources like this and reflecting on how to improve our models helps the cause.  

Likewise it's fun to share the hobby and layout with young people, including my sons Teddy & Pete, both shown having some fun while switching Euclid Yard.  I work to teach them to be careful with the delicate models and the throttles, but also to enjoy the trains and have fun working together moving cars.  


It remains a wonderful hobby, and a great way to share time together for friends and for family.  I am grateful for both!

~RGDave

Monday, April 29, 2019

A Collaborative Month

Long-time readers will recognize the title of this post, as we have discussed the importance of collaboration here before.  A railroad of the complexity of the Onondaga Cutoff would simply not be anywhere close to this operational, let alone with scenery, without help from trusted friends who are skilled modelers and technicians themselves.

As an illustration, this month I was fortunate to be part of several collaborations with the local group of layout owners.  First off was an evening weathering with David Olesen, whose 1986 CSX layout following the former C&O main line over Allegheny Summit is coming along.  He asked to see how I weather locomotives, and brought a few of his new purchases to be our subjects.

 

Alongside David, I weathered my recent purchase of a CN C40-8M, a fabulous model by Rapido Trains.  Rapido, in my view, is really coming on strong with excellent models of critical locomotives and cars that modelers have been asking about for many years.  


A few weeks later, I accepted an invite from Tom Schmieder, who is working to construct a large and intricate operational layout based on the DL&W's New Jersey lines west of Port Morris in the early 1950's.  He had a group of accomplished modelers there, including Perry Squier, Jerry Dziedzic, and Tony Koester and it was a pleasure to work alongside them.  Bob Bahrs, an expert on DL&W operations in NJ, was there to lend a hand as well.  We had some discussions about decisions Tom was facing, and I think the consensus as usual led to the best construction going forward.


While just at the benchwork stage, this railroad is going to be something else once it is working.  Our region has needed a Lackawanna operation for some time and this will be it!


Finally, just a few days after that session I was able to spend some time on Jerry Dziedzic's NYS&W layout, where we modified the approaches to a bridge on his railroad to more accurately reflect the prototype.


Pardon the grab shot, but it illustrates the point I am making: collaboration is possible in many ways, and all of them can be fun as well as productive.  It may sound intimidating, but I would argue the benefits outweigh the costs by quite a margin.  There are a lot of subject experts in the hobby:  why not let experts be experts, and trust them to assist in your vision? 

I have a feeling you won't be disappointed!

~RGDave


Friday, August 14, 2015

Summertime, Again!

Over the last few years, a pattern has developed that limits layout time during the summer.  With so many outdoor activities going on, and all sorts of family gatherings and weekend trips to organize, time for progress on the Onondaga Cutoff is limited.  Still, I aim each day to make some sort of effort to move things along, however small that may be.


This car has a neat story:  At the last operating session, an operator donated a car from his freelanced shortline to my roster.  It's a great model that he lettered and weathered himself.  All I had to do was install the resistive wheelsets for block detection on my layout.  CPN 2016 will enter sand service on the Onondaga Cutoff.  And, while I was at it, I finally finished up the PC flatcar at right with heavy weathering as well as resistive wheesets.  The PC flat will enter the MOW fleet.  Both of these were relatively quick projects - a total of 1 hour spread over three nights - that help to keep progress moving on the layout.

A recent locomotive project was to model a Union Pacific SD40-2, to add to the fleet of run-through locomotives on the roster.  This engine came factory decorated from Intermountain as UP 3367, but in the as-delivered paint job from the 1970's.  Following great advice from Joe Atkinson, I removed the lettering and added decals to bring the engine to its appearance in the mid-90's.  Here it is, ready for weathering!


In addition to rolling stock, small windows of time are perfect for adding small details that help a layout stand out.  I finally got around to adding the joint bars to represent insulated joints at CP 282, beneath the big signal bridge there.  The joints, while subtle, really make the scene more complete, at least to my eye!


Much more challenging projects are on the horizon as we head into autumn in New Jersey.  With the help of my daughter Susie, I started to make more background trees to continue scenic progress behind Onondaga Yard, and will need several hundred more of those for scenery to continue on the M&E.  There are also a variety of locomotive projects at hand, including a relatively challenging kitbash to create GE C30-7A's in the Conrail livery.  Plenty of updates to come!

~RGDave


Wednesday, March 5, 2014

More Collaboration

In several blog entries over the last few years, I have mentioned a growing notion that the Onondaga Cutoff is becoming a community-oriented model railroad.  While it is located at my home, the contributions of several guys have been critical in bringing the operation to life, whether that be in signal design, signal construction, operation planning, and the addition of details to many scenes.  A big THANKS is in order for all that have pitched in!  The layout has really matured quite a bit in a few years.

Here's a photo of another recent collaborative process - Mark, a longtime friend and fellow operator and modeler who casts models of truck cabs out of resin, has built and supplied a Conrail knuckle-boom truck for the maintenance-of-way fleet on the Onondaga Cutoff, in exchange for airbrush-weathering services on some of the cars in his fleet.  Here the Car Department works on a bad-order hopper car, set off at Onondaga Yard:


We figured out a rough estimate for each service, and are simply trading services, each of us doing for the other what would take an entire learning process.  All I will do to this model is to add window glass and a painted interior.  While scratchbuilding trucks for the whole layout would be enjoyable, on a large layout there are tradeoffs to be made.  The time spent learning to produce a model like this was instead spend weathering models for Mark, plus weathering track and installing signal system components.  It's a win-win for us both.

Relying on collaboration - a 'little help from my friends' - is the only way a large layout like this will approach a finished state in any reasonable amount of time, and along the way, we're having a great time!

~RGDave