Showing posts with label Onondaga Engine Terminal. Show all posts
Showing posts with label Onondaga Engine Terminal. Show all posts

Wednesday, August 21, 2024

Be Prepared

It's an old boy scouts saying that this Eagle Scout won't forget:  'Be Prepared'.   When we think about it, those two words are saying a lot about how to live life.  It is a motto that changes how we look at life.  


Here we have newly outshopped Conrail SD40 6286, a model whose prototype was a veteran locomotive of the B&O, then CNJ, then on to Conrail.  I've modeled it to fit its appearance circa 1994, and it looks the part.  However, that is not the only thing that matters.  The rest is harder to see in a photo.  The wheels are in gauge, and cleaned.  Couplers are at the right height, and work.  The track was cleaned.  New lighting works, sound is leveled and adjusted.  The unit is speed matched to the others in the fleet on the Onondaga Cutoff, just as all the B23-7's in the distance are matched, as well as cleaned and ready.  

It is a lot of work, but cleaning ahead of each session means that dirty track and wheels won't be a problem as we run trains.  In other words, we eliminated a few variables that can make a session less fun. Part of being prepared is doing what we can to avoid problems.  

The Onondaga Cutoff is a small way in which I can live by that same old motto, and thanks to the help of others, it is part of the fun.  It is true that a setup night doesn't fix the other problems in life or in our world, but it is a beginning, and a start, and a way we can make something better.  Being prepared allows us to take a deep breath and enjoy that moment where things are in good shape, ready to start.  It's a good place to be.

Monday, December 9, 2019

Long Winter Evenings

As the Holidays come and go, we're reminded of good memories and challenging ones, of time with friends and family, and perhaps a nostalgia of times gone by.  Model Railroads can be great time machines and the Onondaga Cutoff is no exception.

Here's a view, courtesy of regular operator Doug Watts, showing Conrail B23-7 1987 idling on the fuel pad at the Onondaga Engine Terminal shortly after 5 a.m. at the most recent operating session. Doug's camera captured the background sky with the light of the coming dawn, and it's looking a lot like the 1990's in this image!



With that sleepy image, I wish you all a Merry Christmas, Happy Hannukah, or best wishes for your holiday of choice.  It has been an up and down sort of year for me and my community but a decidedly 'up-year' for the Onondaga Cutoff.  Persistence pays off!

~RGDave

Friday, October 12, 2018

Learning About "Photo Stacking"

As time rolls long, change is inevitable.  Some things change for the worse, and many change for the better.  One of those things that is changing for the better is digital photography.

While in years past photographers made images and had to choose the best one for a given audience or taste, that is not the case today.  With the artistic control that photographers have in post-processing for digital images, including Photoshop or other photo editing software, there is a new and exciting ability to convey a final image assembled by using multiple originals. 

In the last few years I have become aware through the model railroading media and other blogs of "photo stacking," a newer technique that allows multiple images with the same framing but different focus points to be combined into one image with much greater depth of field.  Here's my first experience with using this technique on the Onondaga Cutoff:



Note how the track in the foreground, the signals and locomotives in the center, and the backdrop are all in reasonably sharp focus.  Amazing! 

For decades the technique was to use a tripod and long exposure with your F-stop set to the highest available aperture to maximize depth of field.  And that worked, generally - but still kept most extremes in a softer or outright blurry focus.  Photoshop can fix many things but not that.  Enter photo stacking:  separate software that combines the sharpest parts of 5, 10, 20, or more images of the same scene, stacking them and showing just the sharpest parts of each.

I used the Helicon Focus software suite for this, and have lots to learn - but this image was made with 10 base images in about 15 minutes.

Stay tuned as I learn more about this, and share with you here.  This hobby is getting to be more and more fun as time goes on!

~RGDave

Wednesday, September 26, 2018

Night Light

Recently I have installed a variety of new lighting on the Onondaga Cutoff, and I am pleased with the results.

First up are Alkem Models yard light towers.  Here's YAON-20, the night yard switcher, resting at the Onondaga Yard Office between moves.  New towers were assembled from kits by Phil Monat, and boy, what an upgrade!


Over at the east end, here's outbound cars for ELSE ready for their shove over to the East Lead for pickup. I love the clarity of the LED light used on the towers.



Using better light towers here made several of the others surplus, so I reinstalled them around the shop building and facility to suggest it was on its own circuit.


To add to the scene above, I did some quick view blocks and weathering on the old B&B headquarters building, then added some light to it, as well.


While the kits were difficult to build, adding lighting is a relatively simple project and makes a world of difference for night operations and night photos.   Those long nights just got a little brighter!

~RGDave

Tuesday, April 17, 2018

'State of Good Repair'

On the Onondaga Cutoff, one of my most important jobs is to make repairs as needed to equipment and infrastructure that has issues.  Whether due to heavy use, accident, human error, or malfunction, issues crop up that either damage or highlight poor condition of various layout items.  

For operation sessions to be satisfying, the layout and equipment need to work reliably, with as few mechanical and electrical issues as possible.  Track must be clean and well-aligned.  Switches must throw completely, and consistently.  Equipment must have clean wheels and be tuned for operation on grades with heavy trains.  

Prototype railroads use a term used to plan for and fund maintenance items.  'State of Good Repair' (SOGR) applies to assets that are able to be maintained in a usable condition in perpetuity, throughout the useful life of the asset.   This is a living, breathing idea - many variables need to be considered, and the capital dollars needed to upgrade an asset to reach a state of good repair need to be balanced against what the company can afford.  


We need a 'SOGR' for our layouts, too.   Here we have SD60I 5626, an Athearn Genesis model that has performed for years on the layout.  As happens occasionally, the sound decoder in this one suddenly stopped working.  The unit would make noise but not move.  After troubleshooting, I found its address in an old consist.  A quick deletion of the old consist fixed that.  I went further and added a 'keep alive' capacitor system to the sound decoder to help smooth operations.  Now, the 5626 is resting outside Onondaga Engine Terminal, suggesting recent repairs, and in reality it is ready to rejoin the fleet!


The right-of-way too needs occasional adjustment to be in a state of good repair.  Here, Foreman Homoki waits for an addition to his NORAC Form D before proceeding past CP277 during the last operating session.   During operating sessions, we can model the maintenance process used on the prototype with hi-rail inspections, work trains, and the like.   While most of the SOGR maintenance happens between sessions, it is fun to include a model of the work so that operators get a taste of what the prototype does.

I consistently measure and check switch points for proper alignment and motion, as well as monitoring light from signals and structures to ensure what is supposed to be lit actually is lit.  

Even with maintenance operations, we can suggest a prototypical experience.  Operations doesn't have to be all moving trains - a State of Good Repair takes time and effort on the prototype, and we can effectively share that experience and the challenges it creates with others at our sessions.  

Monday, July 24, 2017

Ballasting the Engine Yard

As we have discussed over the years, I feel that scenery is best accomplished in layers.  While the Onondaga Cutoff operation continues, scenery can grow in organically, spreading across the layout in layers that allow your mind's eye to grow along with the scenery itself.   Industrial scenes, just like rural scenes, require some vision of where we want to get to, but that vision changes once the base layer is in.  


For Onondaga Engine Terminal (ONET), I began by adding a 'concrete' apron across the front of the engine house. The kit was built and installed early in the process since the rails run through the drop-floor casting, and so a hole was cut in the subroadbed to fit the enginehouse.  I refereed to prototype photos of Conrail engine houses at Dewitt and Selkirk for guidance on the dimensions of the concrete slabs and how the track was located through the troughs. Composite hardboard made a good choice for the appearance of weathered concrete.


Dark gray grout was then spread across the yard and engine house trackage, with a hefty addition of 'Black Cinders' from Arizona Rock & Mineral.  All of that was soaked with isopropl alcohol and diluted matte medium, and allowed to dry for 24 hours.


Weathering is a critical aspect of any prototype layout, and track is no exception.  Engine house tracks are gritty, greasy, oily, and grimy, with oil- and grease-soaked locomotive sand and ballast. Even when well-maintained, these tracks are filthy!  Arizona Rock & Mineral sells an 'Asphalt Paving Powder' that is a dead ringer for oil-soaked sand when piled about the center of the track, and the same firm's 'Gray Base Powder' is a nice stand-in for fresh locomotive sand that has been spilled here and there, adding nice highlights to the dark grit of the base.


After the engine yard was curing, it was time to tackle the maintenance yard, used to store maintenance equipment, snow-removal plows and spreaders, and the fuel delivery track.  Here, I again used dark gray grout and black cinders, and added some 'Yard Mix' from Arizona Rock & Mineral as well to suggest track less soaked with oil.  Some fresher gray ballast was added where the cabooses are stored as this would be a spot with more personnel about.


Once the area cured for 24 hours, I added some miscellaneous weeds for contrast, and then lined up all the MOW equipment once again.


What a difference some ballast and ground cover makes!  While more subtle than some other recent scenery additions, it's satisfying to get this scene to a more final look.   This sets up the stage for progress further east where some major scenery installations are coming soon.

As the hot, humid summer days pass once again, I am thankful for the time I can spend in the cool basement at the end of each day making some progress and sharing it with all of you.  Enjoy the summer and check back soon for more updates!

~RGDave

Monday, May 23, 2016

A Few Images

With spring in full swing in New Jersey, I'm tied up with outdoor maintenance and with family trips.  So, here are a few photos from the last operating session for you all.  These are taken with my iPhone, with brightness and a bit of cropping adjusted afterwards in Photoshop.

First, new C40-8W 6213 share shop space with a former Reading GP40-2:


A beat-up old Erie Lackawanna gondola sits in Onondaga Yard:


The backshop area at Onondaga Yard, after midnight on May 9, 1994:


WAON-10, the Onondaga Cutoff local job, returns to Onondaga Yard in the late afternoon of May 9, 1994 ahead of some rain showers:


Downtown Syracuse, NY, shimmers in the valley below as dwarf signals and a safety light glow at CP282, before dawn on May 9 1994.


Yard lights provide illumination for YAON-20, doing overnight classification work at Onondaga Yard.


Operation sessions provide lots of good opportunities for snapshots like this, and really let the 'creative mojo' get started.  Often it is images like these that can generate some more ideas for scenes, which helps to keep me interested.

Enjoy the turn to summer, and check back soon - there is always something changing on the Onondaga Cutoff!

~RGDave

Thursday, March 28, 2013

Details Make the Model

While signal construction and adjustment has dominated recent work efforts on the Onondaga Cutoff, I am again making time between signal work to build a few kits and work on other, smaller projects on the railroad.  One of those has recently been to assemble and install the fuel pad kit I had purchased years ago.  After working on it here and there, the 'final' fuel pad has been installed where the wooden mock-up used to sit. 

I'm happy with the look of this facility - I painted the components, and then weathered the slab, collection grates, and office after assembly.  A few figures and details top off the scene.  Now that this is installed, I can assemble the sand tower and finally install the full engine yard surface.  There will be 'concrete' aprons around the facility itself and well-weathered ballast everywhere else.

Details make the model.  On a big layout, details take time, but are worth the effort!

~RGDave

Wednesday, September 14, 2011

Onondaga Engine Terminal

The work is coming to a head at the Onondaga Locomotive Facility - shops are complete, track is in place awaiting wiring, and most turnouts have ground throws!  While I am planning to add on a shop office to the main shop building and a moderate sand & fuel facility, we are getting close here - finally.

First, a shot of the shop complex itself:
I painted and weathered the structure and added hanging lights and miscellaneous details, but most of it is stock.  It is a complicated, time-consuming kit but very worthwhile when done. 

The shop tracks continue for a full two feet past the structure to a back-shop area.  Tracks in the foreground will be 'Ready' tracks that will also have the fueling and sanding racks on them.  The closest one is not glued in place so as to be adjustable, depending on the exact dimensions of the sanding facility.

Next, here's an overview of the whole engine terminal:
Far left is the MOW storage facility for snow-fighting equipment, MOW cars, and long-term locomotive storage.  Then we have the #1 lead, followed by the shop ladder that takes you to bays #2 and #3.  Ready tracks are to the right in this view, and in the foreground we have the mainline and yard throat at CP 280.

The shop looks pretty awesome at night...methinks there will be lots of lit structures on the railroad eventually:

Finally, a quick image of C36-7 6639, resting in the Park Yard awaiting a completed engine facility.  Once the wiring is in place, it's going to be time to add decoders to a bunch more locomotives to fill up the facility!

Enjoy - plenty coming soon as the weather cools and there is less outside work to do.  Over the course of the winter, we will start 'officially' operating the railroad, and major features will go in place - the backdrop, full lighting, etc.  Stay tuned!

~RGDave

Sunday, July 10, 2011

Progress on Several Fronts

As the summer digs in, large blocks of time for layout construction are few.  However, with the water meter repaired, I have moved forward with several major projects as time allows.

First, the engine facility at Onondaga Yard is taking shape.  Here is an image of it, test-fit on location.  The servicing platforms and pit tracks are in place and the columns are attached, awaiting bracing and walls.  Once the entire structure is complete, it will be installed, and I can finish tracklaying in the engine yard.  Conrail C32-8 6611 sits in the facility to give some sense of scale:

Also, the bridge at Skaneateles Creek on the short line is now weathered and permanently in place:
Built from a kit, this bridge received a heavy dose of weathering to represent a structure on a short line without much money to paint bridges.   Still to come here are the guard rails and final abutments, but I'm excited with how this came out.

A close-up view of one of the weathered gusset plates:

Having that bridge in place has allowed me to lay track up to and through the staircase:


Now that the shortline's route is in place up to Eulcid Yard, it was time to put the yard roadbed in place.  With a large, stub-ended area, I decided to try 1" thick insulation foam as a base.  I attached it with latex adhesive caulk, and then clamped and weighted it to ensure good adhesion.  Here is the progress before removing the weights:

So, plenty of progress, little by little!  I will continue working on the engine terminal and shortline in order to try and finish tracklaying before the end of the summer; then once the shortline is operational, it will be time to take a shot at backdrops.  That promises to change the overall look dramatically!

Enjoy the summertime and stay tuned!

~RGDave

Wednesday, May 18, 2011

The Waiting

Progress on the water meter work has stalled, pending support from the local water department.  Due to a stuck valve at the curb, they will need to dig up the front yard and replace the valve before we can do the work inside - a major headache!  On the bright side, once this work is done, I will essentially have modern valves and plumbing over most of the system in the home.

In the mean time, I continue to wire locomotives for DCC, and I recently took delivery of the structure kit that will be the locomotive shop in the Onondaga Diesel Terminal.  Here is the Walthers promo shot of the assembled structure:

Of course, mine will have Conrail locomotives instead, but you get the idea!  Having this structure in hand allows me to finally lay all the tracks in the Locomotive facility, which to this point had been on hold since I need to match the ladder track with the spacing in the floor of the facility.

Coming soon is backdrop installation and painting.  Masonite seems to be a popular choice for backdrop material, and at this point, that is the direction I am leaning - aluminum flashing will be expensive and also will have less stability for painting.

I have found the trick with building a large model railroad and keeping progress going is to keep working on something, even when one job is interrupted by circumstance.  With shortline benchwork (and therefore trackwork) stalled awaiting the new water meter arrangement, I have kept working on other projects. 

Even the waiting keeps me busy!

~RGDave