Showing posts with label Structures. Show all posts
Showing posts with label Structures. Show all posts

Friday, September 27, 2019

On Temperance, and Permanence

Model railroading is a curious hobby of fascination and vision, and one that involves an interpretation of time and purpose.  While the trains take center stage, it is their movement that sets this hobby apart from the majority of other modelmaking hobbies, and the operation of these models in concert with each other and with a plan of some sort that brings life to it.

Temporary structures 'place hold' on a layout so as to get operations started, and give crews some visual cue of why the cars they are moving are placed there.  Such has been the case with Doelger Brewing on my Minoa & Euclid. Here's an overview of the temporary structures:


These are pieces of different kits I'd had from other parts of the layout, and several building flats that were in boxes people had donated to me over the years.  Cobbled together they make a scene look industrial, and with a sign or two that is all that was required to deliver the visual clues I was looking for.

Author Tony Koester has reflected in his writings over the years on the sense of purpose in operations, giving the railroad a sense of time and place in the greater transportation network that makes railroading in general so compelling.  Tony has made the argument that temporary structures pending the permanent models add a great deal to operations, and I agree.  

So, as the brewery continues to be part of the operation I have finally begun construction of the 'permanent' buildings for the industry.  These are from the Heljan kit for the brewery, to which I will add some modern structures and additions.   First step was the brick mortar, which was applied by painting all the brick sheets with acrylic paint in a mortar color, and then wiping the brick faces clean.


Once dry, window frames and doors are installed.  Window glass will come later, once weathering is completed.  I like how the paint is uneven, suggesting bricks laid in different courses by different masons.  The windows 'pop' with the drab brick around them.   Finishing details will include painting random bricks different shades, and I think it will be convincing. 

Since the structures will be lit, I sprayed the interior side of all walls with a dark gray color so as to prevent light leaks, and used magnetic clamps to hold the glued seams square while they cured.


Testors plastic cement worked very well here so far, and with the clamps I am getting nice tight joints that are so far lightproof.  I will use shadowboxes inside the structures so that certain windows are lit and others dark at night.


For the interiors, I am also planning to install a brewhouse, so that you can see through the large windows into the tanks and kettles for the brewing process.  I think that will be especially striking at night.

The architecture part of model railroading is one of many subject areas, and each offer areas to learn and explore.  More to come as this process continues!

~RGDave

Tuesday, March 27, 2018

From Stand-In to Actual

Since the Onondaga Cutoff was designed for operations, it was critical to the construction effort to have operating sessions sooner than later.  In addition to having fun, the sessions can teach us about what needs to be improved about the track and capacity of the railroad.  Changes and upgrades can be made to the track and infrastructure much more easily before scenery is completed.

Therefore, I used a variety of temporary structures early on.  These were important to give operators a feel for what would be there eventually, and provided cues for fun operations at the same time.  One of those was the enginehouse on the M&E.  This was a structure I'd had since about 1985 on my first layout, and it served its time well as a stand-in on the OC.  Now it was time to upgrade.


I choose one of the 'Kitbasher Series' kids from Rix Products/Plastruct, which fit my vision for the modern enginehouse that would represent the shops and the sign-up office for crews on the M&E.  It includes doors and window frames, which I cut in as I saw fit for the entrance and yard office.   I also framed out a small office in the corner of the interior. 

While the structure progressed, I graded the foundation area with sculptamold, filling in any gaps between the yard surfaces and the fascia.   Styrene strips were used to frame out the edges of the pour I would make for the concrete floor of the shops.


Smaller strips were tucked in along the gauge side (inside) of each rail for the pour.  I mixed a batch of hydrocal plaster to the consistency of loose sour cream - thick, but pourable.  It was poured along a guide dowel into the corners first, and then tamped down to minimize air bubbles.  After about 15 minutes it was hard enough to gently pull away the forms, and shape the edges accordingly.


After it cured overnight, I stained the new foundation with a variety of burnt Sienna and gray colors to achieve a look of well-worn concrete.   Once the paint dried I weathered the surface with chalks and black stains.  As this is a light repair facility, I did not include any inspection pit or drop tables - this tiny facility for a short line wouldn't have that sort of investment.


I added interior lighting and some interior details, enough to suggest a well-equipped facility for inspections and repairs.  The structure was weathered with dull coat, then just a light application of pastels and oil washes to replicate a well-used but newer and well-maintained structure.

A wheelset storage track was added before a layer of black cinder and yard ballast, which is shown above curing with some sand piles and grit along the rails. 

Next steps here are ballast highlights, vegetation, and some more detail to complete the scene.  M&E crews will now have a much more prototypical scene from which to start and end their runs!