Showing posts with label MRP. Show all posts
Showing posts with label MRP. Show all posts

Wednesday, August 7, 2019

On the Cover of Model Railroader!!!

Continuing with the theme of balance in the wake of a challenging few months, I am thrilled to announce that the Onondaga Cutoff has been featured in an article published in Model Railroader magazine! 

While I knew the article was coming, I had no idea that it was in consideration for a cover shot, and so that will live as one of the best surprises I've had, ever.  I am still in a state of shock weeks after the author copy arrived in the mail.  I'm so thankful to be able to contribute, and hopeful that perhaps somewhere a young person will see this and be inspired as I was so many times in my youth.  Coming from a non-model railroad family, this magazine was a wonderful source of excitement for me when I was able to get my hands on it. 

Regular readers will remember the article published in Model Railroad Planning ('MRP') 2018, which gave an overview of the layout and its origins.  That one got the train rolling, so to speak, and I was able to build on that momentum to develop several article concepts for the main magazine.

This article is the first of those to be published.  It is part of the September 2019 issue of MR, on the shelves now, which has several articles coordinated around the idea of running model trains over '24 hours' including simulated dusk, darkness, and dawn, as well as with the lights on.  One of the early goals for operating trains on the 'OC' was to simulate a rolling schedule on the railroad, including round-the-clock operation and the challenges (and mystique) that changing light conditions bring to prototype railroad operations.  This has proved very popular with operators on the OC, so my writing is centered on getting your room and layout surfaces lit for operations, with photos and some ideas to help it come together.   

As a subscriber for some 35 years, it's one of the life goals I have had, and now it's on the books!  Thanks for your support.  This is a wonderful hobby to share.  More to come as always, but this highlight will remain for a long, long time!


Thursday, January 18, 2018

Complete, but not Finished - and the Onondaga Cutoff, In Print!

Big news lately on the Onondaga Cutoff - first, Model Railroad Planning 2018 arrived! As expected on page 44 my article appears.  Kalmbach did a beautiful job putting it together! 


It is such an honor to see this in print, and to see it next to names that I grew up admiring through these pages and those of Model Railroader magazine.  What a rush!


I also have some smaller success to report on the railroad itself.  While waiting for MRP to arrive, I made a big push to complete the scene on which I have been working for several months.  (I had series of late nights in the last week or two.)  The results are what I'd hoped - the scenery was completed ahead of the most recent operating session, and now the railroad has scenic greenery all the way from CP282 and the Syracuse skyline along Onondaga Yard, around the big turn to the east past the dairy farm, to the automatic signals on the bridge at MP 278.8!

First I taped off the areas along the main line where I didn't want grass - the maintenance road, and the track areas.  Once that was in place I installed a mix of static grass as a scenic base.

Once the grass was down, and not yet dry, I proceeded to put down a layer of cinders for the shoulders of the ballast area, and then the ballast itself as shown.

Ballast is spread by the time-tested manner of a brush, with my own addition also of some foam cut to fit which I use as a sort of regulator along the tracks.  Moving this gently back and forth knocks the dust and stones off the rail web and base, and helps to smooth the profile overall, ensuring most ballast stones are down between the ties where they belong.

Here's the profiled ballast before the glue process.   As I have noted here years ago, some of the chalky dustiness will go away after the ballast is soaked with isopropyl rubbing alcohol and diluted white glue (or matte medium).  Once it is soaked it needs to dry for about 36-48 hours to harden.

And, here's the result!  What a change from the earlier photo above.  

Here is the ballasted area beneath the overpass to the east of Onondaga Yard, with all the new scenery in place besides it.  Some details have yet to be added but this gives a good feel for the general look of things.  To some degree, the new scenery seems to belie the amount of thought and planning that went into the scene - this appears as though it has always been this way.  

It's been a great start to 2018, here's to the next few steps on the Onondaga Cutoff - some overdue equipment maintenance and getting a few new locomotives into service.  It's nice to be able to look at this progress each day!

~RGDave

Friday, December 15, 2017

Publication - of the Onondaga Cutoff!

I have been working for some time on a major announcement regarding the Onondaga Cutoff - and today, I can say with excitement that a full-length article on the layout will be published in Model Railroad Planning 2018!


Model Railroad Planning is a special edition, produced by the publisher of Model Railroader, once each year.  It focuses on layout planning and construction, and that's exactly the angle that is taken with my article, which will be published in early January.


I am so grateful for the opportunity, and for the incredible assistance offered by many through the years.  I am hopeful that this is a start to a series of in-depth articles I can create about modeling and layout construction, and that makes me even more thankful for the assistance and guidance.

Best wishes for a happy and healthy New Year!

~RGDave