Showing posts with label cleanup. Show all posts
Showing posts with label cleanup. Show all posts

Friday, July 7, 2023

Organization in the Chaos

There's a lot to be said for the occasional cleanup.

Our hobby of railroading, including model railroading and rail photography, is one where we seek a break from the rest of our worlds.  When life is good, a break is a nice and relaxing thing.  When life is hard or chaotic sometimes the break is the only thing keeping us sane.  How much better are those breaks when you can jump in and get right to work?

If the workbench is a mess it is much harder to get right to work.  Recently I was searching and searching for detail parts I was sure I had in my inventory.  After a half hour of rooting around, I realized it was well past time to get organized.  The first step?  Laying everything out to get started.  


There's no one way to organize things like this; I organized first by manufacturer and then by category.  I decided to take the piles in the image and put like items together:  antenna, snowplows, MU hoses/MU receptacles, eye bolts/grab irons/lift bars, doors/grates/hatches, etc etc.  Not perfect, of course, but finally categorized in a way that should held avoid searching blindly.

In these humid days of summer, do yourself a favor and organize the workbench.  Your hobby breaks will benefit!

Friday, September 16, 2022

Bangin' Around

Major construction is always a mixed word for modelers. It is usually done for the right reasons, and generally can be planned to minimize disruptions with the proper precautions.  We are making the move to split-unit 'ductless' HVAC in the house, which requires extensive electrical preparation in the basement - right over the railroad.  


 I had installed modular scenery here on the wall over the electrical cabinet and once again, that paid off in that when we needed access a few screws were removed and the whole wall of trees lifted off evenly.  But the breaker box is right adjacent to and above the Skaneateles Creek bridge on the M&E.  One slip of the box and the bridge could be crushed.  So, I constructed a special 'sarcophagus' around and through the bridge, designed to take the hit and protect the bridge.  


Also needed anytime construction comes along is dust protection for the layout.  The entire OC was covered in sheet plastic, with signal bridges and other fragile taller items bracketed by paint cans in an effort again to protect them in case of something falling nearby.  For good reason, I might add.


There is just no way around it - messes happen.  Here's a big one, right at CP280, and I am thankful I covered the layout but also horrified at the amount of debris and dust.  Yuck!   So, the last few weeks have been loaded with days and nights prepping and cleaning up like this, which makes for a long few weeks.  

Now that fall is coming there will be more opportunity to get down to the layout and continue progress, but for now it will be of the cleaning sort!