Over & Under

Now that the dairy farm scene is largely completed, I am working on the two bridges immediately east of the farm scene - an undergrade bridge, and and overhead bridge, in Conrail parlance.  Bridges on different railroads are noted in different ways.  Some railroads use a 'bridge number' where the structure is numbered beginning with '1' as the first structure, then 2, 3, and so on.

Conrail used the milepost to create a unique bridge number, down to the hundredth of a mile, numbered from a survey identifying the easternmost point of the structure.   I have numbered mine within milepost 279, which is to say west of 279 but east of 280.   The undergrade bridge is 279.17:  two hundred seventy-nine point one-seven miles from the bumper post at Grand Central Terminal in New York City, Milepost 0.0 on the Water Level Route.  This bridge is based on a prototype in Syracuse (and another in Little Falls, NY) on which one could still see the NYC markings beneath the rust and grime.  A heavy dose of weathering is coming soon to this structure!


The girders rest on poured concrete abutments, modeled from the stock Walthers kids, and cut to fit.  Again these are just placed in for now, a test fit of sorts, before full weathering and assembly.  Note too that there will be a second abutment placed behind the one visible to suggest the right of way that used to carry more than two (three) tracks - since the East Lead of Onondaga Yard is present here too.  The drainage ditch is in place, and once the bridge is painted and weathered, it will be glued in place too, opening the door for finishing this scene.


West of 279.17 is overhead bridge 279.89, my ongoing kitbash of a highway bridge from the stock Walthers truss.   You can see here now that it has its railing installed for the sidewalk, the railing being the stock Atlas 'hairpin fence' made for intertrack fence applications at train stations.  For me it captures that perfect 1930's vintage look for an old steel bridge railing.  There will, of course, be several photographers foaming appropriately over the Conrail (and NYS&W, Amtrak, etc) action.

Current efforts are focused on building up the embankment behind that bridge, and finishing it to the same standard as the surrounding territory.   Foliage will come next and then the road surface, after which the whole scene can be detailed and ballasted, a goal of mine by the end of this winter.

Little by little!  Each day counts with progress over and under the railroad as well as along it.  Happy Halloween to you and to all the trick-or-treaters out there!

~RGDave


Friday, September 22, 2017

Landforms and a Scene Break

Building on the recent progress with the new bridge, I proceeded to locate the structure and its abutments on the curve east of CP 280, which allowed me to install a modified piece of fascia to accommodate the embankment.  This in turn allowed me to finalize the edge of this part of the layout, and proceed with installation of the basic landform.

 First the new fascia in place, with the rise cut in to cover the end of the embankment:

Here is the webbing after installation, using hot glue to tie it all together (notice that nice green paint on the new bridge, too!):

Now we see the webbing covered with plaster-infused gauze.


It is still amazing after the years of staring at this scene without the landform how quickly it changes, and how much better it looks!  Suddenly, it is much easier to see how the scene will come together.  With some Sculptamold and then a base coat of paint and static grass with some foliage, this area will suddenly come to life.

Little by little, and sometimes, more!

~RGDave