Monday, August 20, 2012

Slown' Down

The dog days of Summer are here in New Jersey, and our new little addition is growing fast.  The adjustment to fatherhood has been a curveball, at best, and it takes most of my time and energy to stay ahead of the 'usual' household tasks these days.  So, time for the Onondaga Cutoff is very limited.  When I have a few mintues, I am working to complete some small equipment projects.  First, a new B36-7 is coming along, almost ready for paint.  I need to install a few additional radiator intake grills and some miscellaneous details, and we'll be off to the paint booth for some Conrail blue:


Next, an LPG tank car that has been waiting for years to be finished and added to the roster is done, awaiting pick-up by the M&E:


A wise voice has advised that sometimes, it's important to slow down and appreciate the ride itself, even if it's challenging.  And so, I am working on that these days, working to be present for my daughter and my wife, which of course comes at the direct expense of time for anything railroad related, be it 'prototype' or model.  It figures, of course, that this would coincide with the exact time at which NS decided to launch the most amazing heritage program in recent memory.  Norfolk Southern, long known for its black locomotives and aversion to fans, goes and paints 20 brand new 'heritage' engines in long-disappeared paint jobs, and goes further to begin a revival of mainline steam in the east, even on the former PRR mainline.  It's best time in 30 years to be out chasing trains and I am at home, tending to the new responsibility of fatherhood. 

They say it's a blessing when you have to choose between good things.  To me, it's frustrating. When too many good things are going on at once, you're going to miss a lot.  Times like these mean that I just gotta keep pushin'!

~RGDave

Sunday, July 15, 2012

This time, a REAL new arrival!

Hello all,

It's with quite a bit of joy that I present to you a new arrival that, for once, is not railroad related:


My wife and I welcomed Susannah Grace into the world just a few days ago, and we are blessed with a healthy, happy, and hungry little girl!  Sleep has been hard to come by these days and there is a natural chaos to the process of learning to be a parent, but what a ride.

She has yet to see the Onondaga Cutoff.  And it's been a few days since I got much done there, too.  But, rest assured, that's coming soon :-)

~RGDave

Monday, June 25, 2012

Operations

This past weekend, I hosted the most recent Operating Session (OS) on the Onondaga Cutoff, and it was a success - a crew of 6 ran approximately 30 through trains, two locals, and the M&E turn over the course of about 4 hours (and several beers).  Jack was a stellar DS, as always, and the crew was great:  Nick, Mark, Al T., and our special guest this week, none other than the Doctor, Mr. Al Werner, many thanks to you all.  Al W. drove several hours down to the OC just for this session.  Thanks, Al!

Conrail train SEBU works the North Runner at the west end of Onondaga Yard while setting out cars on 6/22/12.

With much wiring still to do for the signal system, that work is the next major push for the railroad.  As it requires re-wiring one main track as well as locating junctions for the BD-20 detectors, the railroad is out of service while each pair of blocks is wired up. 

Plenty to come here, as always.  It's a great hobby, isn't it?

~RGDave

Thursday, June 14, 2012

Action!

As work progresses on the house projects, I have squeezed some time in for the railroad.  After getting the 6807 set up for service, I have repaired several units that had minor electrical issues, set up a few new cars for service, and also worked to complete a long-time goal of adding sound to one of the B23-7's that calls Onondaga home.  I chose the 1987 to recieve my first-ever installation of a sound decoder.

I chose a Soundtraxx 'Tsunami' decoder, as they are well-recommended, and they also make one specifically for the GE FDL-series prime mover.  On their website, you can hear samples from each decoder, and it's very impressive.  So, I took the plunge, and here is the result.  The 1987 comes down the North Runner to the West End crossover, just as your videographer is surprised by westbound TV-207 meeting eastbound TV-10 right at CP282.  As Ken says - 'Safety First!!'

Turn your speakers on!


Let me know if the video works - it was filmed with an iPhone, and should come up when you click on it.  I am hoping the computer can figure out how to make it come together for you!

That TV-10 train is almost entirely recently-finished cars and UPS trailers, just like the real one was.  CR 6807 leads SD60I 5544 while the 1987 chugs away in the yard.

Sound is adding a whole new dimension to the Onondaga Cutoff!

~RGDave

Thursday, May 31, 2012

Balance

A critical thing to keep in mind when building a large layout is balance - the fact that the rest of life keeps going, too.  There is much to do around the house besides the model railroad, as all homeowners know very well!

Currently there is a major project underway at our home - finishing the attic, and adding a staircase to allow for better access to the attic space. 
The Future!

Here we see the ceiling of one of upstairs bedrooms as been removed, as has the floor of the attic above.  The big, rough-cut timber stringers and bearing wall are now exposed and will soon support a new staircase.  I've enlisted the help of a contractor for this heavy work. The attic above will have new power and light installed, then a new baseboard heating system, and finally the space will be insulated and then finished with sheet rock and painted.

All this, while the railroad takes small steps of its own.  While I'm thinking of backdrop or finishing a modeling project, it's important to step back sometimes and realize how important everything else is too!  Our hobby is a wonderful escape and helps us re-engage reality.

~RGDave

Friday, May 25, 2012

What a Difference…


While far from complete, the backdrops on the Onondaga Cutoff are now spackled, sanded, and primed – and what a difference this makes in the appearance of the layout!  The white primer at least provides a uniform background for the trains and trackage.  

Also of note here is the 6807, just finished this evening - a nice Conrail SD50.  The 6807 is from the last order of Conrail SD50's, and as such rides on the EMD 'HT-C' trucks, instead of the older 'Flexicoil' trucks (like 6495 has in this image).  Athearn did a beautiful job with the CR SD50.  I had to add some Conrail-specific details, including the 'bug-eye' classification lights and the cab signal box.  I also added a TCS T-1 decoder, installed some miscellaneous details like MU hoses, lift rings, and a snowplow, and weathered the unit - it's ready for service!

The next step for the backdrop is to paint a sky with some high-level wispy white clouds.  Following my good friend Ken’s advice, I am going to make sure the ‘sky blue’ includes plenty of light gray, since skies here in the Northeast usually contain at least some humidity!!  

In my planning for the backdrop, I spent time looking at the sky – and noticed that the sky at the horizon is almost always brighter, and more white, than the sky above.  There is a gradual but definite fade to darker blue as you look from horizon to sky.  I plan to try and replicate that as best I can.  I am no artist, but will do some experimentation to see where the project takes me.

A very important part of convincing backdrops is the lighting for the railroad.  My plan is to use LED strip lighting to fill in the general space, and to continue to use the halogen track lights to create shadows and add the yellow color that filtered sunlight generally provides.  Any suggestions are welcome!
Signal block detection is continuing, as well as some mechanical department work – building resistive wheelsets, detailing cars, and detailing/programming locomotives.   I try to fit projects into the time I have available for the model railroad – sometimes that’s 5 minutes, sometimes it’s several hours. 

One of these days, I am going to begin work on a pair of Conrail B36-7’s, beginning with the Atlas B30-7 model.  They will need minor body work and extensive additional details, plus a coat of paint and decals.  Each of these is the ‘silver series’ model and as such, they will also need after-market decoders.  My plan is to purchase sound decoders for these models, and give sound installation a try for the first time.  Stay tuned!

Thursday, April 26, 2012

Some Variety

Right now, there are two large, arduous tasks underway on the Onondaga Cutoff:  installation of block detection and the sanding (of spackle) and then painting the backdrop.  The prior involves significant wiring changes and cutting new insulation gaps into mainline track.  Both are not much fun.  The latter involves a tremendous amount of spackle dust, which is flat-out miserable.  I took a block of time last weekend and just plowed ahead with it, finished the sanding and got all the backdrop primed.  I'm really, really glad that I am done with that part of the project.  Tasks like these take hours and hours to do well, and neither will be complete any time soon.

This can get frustrating, especially with the rest of life going on, and the new summer coming soon.  My answer to the frustration is to give myself a break from those activities once I get something done, and instead focus on another project that can lend more immediate satisfaction.

One of these has been equipment upgrades, as you have seen over the last few months.  Another is putting new cars into service-and I am proud to introduce you to the first new cars for the Peter Doelger Brewing Corporation, located on the M&E.
PDBX 1201 is one of what will eventually be 7 similar cars, all for modeling the movement of finished product from the brewery to the world off the layout.  I have two cars done, a third in progress, and more to come.  A key feature here is the custom decals, made from digital photos of the actual beer bottle labels.  I used small decals, as that is more plausible for a 1990's-era car than a large logo would be.  Here's a close-up view:
Many thanks go to Mark for all his help with this project - these decals are perfect and just what I imagined they would be.

Further, I also decided it was time to upgrade the local interlocking control panels from cardboard to masonite, even though the final boards are coming soon as well.  Cardboard, while OK at first, did not stand up to the operating environment.  Masonite is much stiffer and more stable.  Here's now the new 'temporary' board looks at CP 280, screwed securely to the layout subroadbed:
It's nice to be able to accomplish side-projects that give a sense of progress while the bigger projects drag on and on.  As always, the key is to just keep working, even bit by bit.  Eventually, it all comes together!