Athearn, as part of their Genesis line, did a nice version of the Conrail SD70 some years ago. I have two of them for my fleet, even though they are on the modern side of the period I will be modeling. Everything you see here is out-of-the-box besides the weathering, coupler lift bar, upgraded plow from Details West, and MU hoses. Here, 2572 leads a TV24 train near CP277:
Here's part of his 38-car intermodal train passing at speed above the temporary interlocking panel at CP 277. The panel will eventually be plexiglas.
I'm also having a blast running two trains, as mentioned a few posts ago. Here I have Morristown & Erie #19, an Alco C424, working a local train and being passed by TV24. The 19 will be one of the mainstays on my shortline.
As a side note, our cat, Clarence, is also a big fan of 'guy time' in the basement with the trains. He's quite a character, very social, and generally gets himself in trouble raiding the garbage at some point during the day, which means he is banished to the basement with me at night :-) He usually demands some attention from me while I'm fiddling with the layout unless he finds some spider crickets to hunt.

My latest big manifest is running with a recently-upgraded leader and a freight consist that I am labeling INSE (Avon Yard in Indianapolis, IN to Selkirk Yard (near Albany), NY). Here, the head end has crested the grade at CP282, but is still dragging its 50 cars of manifest over the summit:
The freight consist includes boxcars full of recycled, shredded cardboard and paper for the paper mills of New England, empties for eastern chemical facilities, scrap loads, and empty covered hoppers headed for pellet manufacturing plants in New Jersey. Empty CN family boxcars and NS loads round the big curve east of CP282:
Following the train east, we see it about to enter CP280 at the other end of the yard. In the background are some loose tracks that will soon be permanently laid. After some good advice from many of you, I settled on the idea of using a gardening fabric as a base for the yard. It is 1/8" deep, and tightly woven, which eliminates sound, allows for a lower profile than the mainline, and gives a nice separation between track and plywood. INSE at CP280:
Today's power includes a recently-upgraded Conrail 6569, a C30-7A, along with SD40-2 6524 and CSX C30-7 7003, a former Family Lines unit. Here is a profile of 6569, a 1993 kitbash I built and painted.
We turn and look east as the head end rolls into the 'rising sun' (and my nice Genesee beer blackboard :-)
Finally, the units round a curve over towards CP277 as they begin to slide downgrade.
Enjoy! The next few weeks are busy as summers are, but keep an eye out for updates. Thanks for reading!















And a going-away shot of the same train at the bridge:
It's fun watch the train cross the bridge, with shadows from the truss moving over the rolling stock and locomotives!


Working east around the big curve, I thought an overview would be helpful for you to see where things stand now. Track 2, the closer mainline track, is in place around the majority of the curve now, with staging below:
On the other current 'end of track', working west, is CP 277, freshly laid in place as a basic universal crossover. This will allow trains to work around each other when the local is out on the line, or when a big freight is tying up a main track while working Onondaga Yard. Tracks to the left and right are staging leads and will not be visible once scenery is in place:
One of the things that having the mainline complete will allow is operating 6-axle power for the first time in years. In advance of that, I have started to change out all the old Athearn sintered iron wheelsets to nickel-plated brass wheels, made by Northwest Short Line. Here is Conrail SD50 6789 with her new shoes:
The track looks pretty toy-like, right? I put a bit of old ballast down to see how that looked. It's too white, and still, the track needs weathering. All those things in good time :-) For now, here's 6789 positioned westbound approaching CP 277 with some ballast down:
Before long, it will be time to weather the 9-Mile Creek bridge and install the bridge track to complete the main line. Then I can run big trains while working on wiring, yard tracks, backdrop, and upgrading locomotives...but at least there will be trains running!