Wednesday, October 30, 2019

A Visit to the Chicagoland RPM....and Legendary Operations

In a mark of just how busy these last few weeks have been, I’m making a rare blog update from the phone, making use of the commute home.  While most of this month had been good stuff I’m running right about at capacity these days, hoping that I’m not overlooking anything of consequence!

The month began with unprecedented good news when a project I’d suggested and worked hard on came to fruition:  three ‘Heritage Engines’ were released to the world by NJ TRANSIT on October 2, 2019.   

Then, I had the good fortune to be able to attend the famous Chicagoland RPM (railroad prototype modelers) meet at Naperville, IL this year.   The RPM is famous for is clinics and model displays, and for the list of accomplished modelers that attend.  For me, it was also a chance to operate with groups on Bill Darnaby’s famous Maumee Route, and Bob Hanmer’s well-regarded GN/DM&IR layout.  


First up was the Maumee, a railroad I’ve read about for decades in Model Railroader, Railroad Model Craftsman and the rest of the hobby press.  Bill has created a masterpiece of operation, plausibility and detail.  The Maumee represents a fictional road crossing northern Ohio, in the mid 1950’s.


My first run on the route was passenger train #18, and I was too new to even think of taking a photo of that run.  Making your first run on a timetable & train order railroad that is new to you is a nerve-wracking experience!   But the second run, an eastbound extra empty coal train, allowed me to grab this view of the Ohio countryside.  Wow!


Bill’s attention to detail is truly amazing.  Each interlocking tower is built and detailed with the full rod system laid out for the viewer.  Here’s Miami Jct with the Maumee main crossing the NYC Water Level Route.


Another amazing junction is at Edison, with diamonds and a siding.  Bill has his operators use modeled Armstrong levees to line their route and indications through the plant.  Incredible execution of a great idea.  It was an honor to participate!



After a day at the RPM and exploring some of the area, we did another session at Bob Hanmner’s home with his Great Northern/Duluth, Missabe & Iron Range layout.  This layout depicts the neat trackage rights agreement between both roads in central-eastern Minnesota during ore season.  Here, Jerry Dziedzic and Joe Binish enjoy some commentary during the session.


I love this spot, a big DMIR bridge and ore train behind a massive 2-10-4 steam engine.



The RPM itself was a great one too, and a special treat was the local modelers displaying their work.  Here’s two beautiful Elgin, Joliet & Eastern SD38’s.  


And, finally, a really neat Metra F40C.  These models reminded me of a trip with Jack in 1997 to watch trains around the country.  We traveled by Amtrak and had an amazing series of adventures that in hindsight were almost utopian in their storyline.   It was a great way to close out a great trip, made despite the usual chaos and headwind of middle age.   Special thanks as always go to my wife Kristen and children Susie, Teddy & Pete for the time away!   They were all waiting for me upon arrival at the airport which itself is a dream come true.

More to come!  Lots to share as 2019 continues to be a banner year!

~RGDave

Friday, September 27, 2019

On Temperance, and Permanence

Model railroading is a curious hobby of fascination and vision, and one that involves an interpretation of time and purpose.  While the trains take center stage, it is their movement that sets this hobby apart from the majority of other modelmaking hobbies, and the operation of these models in concert with each other and with a plan of some sort that brings life to it.

Temporary structures 'place hold' on a layout so as to get operations started, and give crews some visual cue of why the cars they are moving are placed there.  Such has been the case with Doelger Brewing on my Minoa & Euclid. Here's an overview of the temporary structures:


These are pieces of different kits I'd had from other parts of the layout, and several building flats that were in boxes people had donated to me over the years.  Cobbled together they make a scene look industrial, and with a sign or two that is all that was required to deliver the visual clues I was looking for.

Author Tony Koester has reflected in his writings over the years on the sense of purpose in operations, giving the railroad a sense of time and place in the greater transportation network that makes railroading in general so compelling.  Tony has made the argument that temporary structures pending the permanent models add a great deal to operations, and I agree.  

So, as the brewery continues to be part of the operation I have finally begun construction of the 'permanent' buildings for the industry.  These are from the Heljan kit for the brewery, to which I will add some modern structures and additions.   First step was the brick mortar, which was applied by painting all the brick sheets with acrylic paint in a mortar color, and then wiping the brick faces clean.


Once dry, window frames and doors are installed.  Window glass will come later, once weathering is completed.  I like how the paint is uneven, suggesting bricks laid in different courses by different masons.  The windows 'pop' with the drab brick around them.   Finishing details will include painting random bricks different shades, and I think it will be convincing. 

Since the structures will be lit, I sprayed the interior side of all walls with a dark gray color so as to prevent light leaks, and used magnetic clamps to hold the glued seams square while they cured.


Testors plastic cement worked very well here so far, and with the clamps I am getting nice tight joints that are so far lightproof.  I will use shadowboxes inside the structures so that certain windows are lit and others dark at night.


For the interiors, I am also planning to install a brewhouse, so that you can see through the large windows into the tanks and kettles for the brewing process.  I think that will be especially striking at night.

The architecture part of model railroading is one of many subject areas, and each offer areas to learn and explore.  More to come as this process continues!

~RGDave

Monday, September 16, 2019

Rapido Visits, Again!

A nice surprise on September 9 was another evening visit from Rapido Trains to the Onondaga Cutoff!   This time around, Josh and Jordan of Rapido reached out to see if they could visit as part of a larger trip doing some research on upcoming projects.

They were mum about most of those, of course, but I did get to hear about Jordan kissing a Rohr Turboliner later that same week.

If that Turbo comes to be, you can bet you'll see one on the Onondaga Cutoff - Amtrak used those regularly on the Chicago Line between New York City and Niagara Falls in the 1990's!

No matter who I've met from Rapido, they have all been fun, informed, and wacky in that happy model railroader / railfan kind of way, and it feels like I've known these guys forever.  The three of us share some modeling interests, especially Jordan and I who have a lot in common in Conrail and in SP interests.   After a tour of the 'OC' we took a few photos of the guys in the layout room.


Employees from Rapido all seem to love layout visits, and Jordan is a Conrail fan. Here's a group shot of all three of us next to CP282.  Rapido's presence on the layout is growing.  Later this year Rapido's much-anticipated B36-7 models are due, and several are headed to the Onondaga Cutoff to bolster the 4-axle fleet.

Speaking of 4-axle GE's, here's my custom-painted B23-7 #1931 working the Cazenovia Industrial Track a few months back.  I put a few photos into Helicon to stack them resulting in a nice depth-of-field, and I liked the result enough that I wanted to share with it you all here.


This caps off a busy summer on the Onondaga Cutoff and I'm excited for the fall.  Next targets include some work to finally finish up the Doelger Brewing complex - as always, plenty of things to come here soon!

~Dave




Wednesday, August 21, 2019

Maintenance Modeling

We've touched on this before here, but one of the interesting parts of railroading that many modelers could emphasize more is modeling the maintenance crews that keep the railroad in good repair.  Every era has them, and with the evolution of mechanized maintenance as well as 'personal protective equipment' (PPE) and safety rules, including some maintenance can help set your era as well.

On the Onondaga Cutoff, Conrail uses custom machinery to help crews maintain track, signals, structures, bridges, and the right-of-way.  Thanks to some custom resin-cast truck cabs and masterful build jobs by my buddy Mark, and to the modification of several of Bachmann's HO scale ballast tamper and hi-rail utility truck, we can model track outages during some operation sessions which adds tremendously to the variety in the operation.


Here Foreman Lee is starting up the tamper, which was left overnight on blue-flag protected track in Onondaga Yard.  The boom truck will drive over in support of the tamper operation.  Ballast tampers on the prototype are used to groom and adjust the ballast beneath and around ties, keeping track level and the ride smooth for passing trains.


As the sun rises and the machine warms up, the crew gets set to head to the worksite.  This involves paperwork for permission to occupy track - a 'Form D' under the Conrail and 'NORAC' (Northeast Operating Rules Advisory Committee) rules, akin to a train order, since maintenance equipment cannot be relied upon to shunt signal systems.  These are normally given verbally via the radio, and it's fun to hear that conversation on the radio during a session - it adds nice variety and 'audible scenery' to the atmosphere.

Consider modeling some maintenance equipment for your railroad!

~RGDave 

Wednesday, August 14, 2019

Warm Nights on the Railroad



One of my primary goals in layout construction on the Onondaga Cutoff is to capture the atmosphere I remember from the 1990's on a healthy, busy Conrail. The second definition of the word is as follows:

Atmosphere noun: the pervading tone or mood of a place, situation, or work of art

Being a professional railroader, and just as significantly being a life-long fan of sitting trackside, has acquainted me with the atmosphere around the tracks. It's exciting anytime but the mystique builds into the night. Add in some warm air, sounds of summer or early fall, the expectation of things to come...you can almost feel the emotion in it.

A few recent images, in my opinion, capture it pretty well. These are taken all in the same few minutes during a recent operation session, and all show train ELSE (Elkhart, IN to Selkirk, NY) waiting and then beginning to work at Onondaga Yard.






For just a moment you can feel like you're back in time, 25 years ago, trackside on Conrail's Chicago Line, while the cicadas and crickets and tree frogs make a racket. For me, I was in love with the railroad and with a wonderful girl; my brother and sister and parents were doing well. The band I was in was playing good music, friends were close and camaraderie all around.  The summer was full of excitement and promise, problems seemed far away and pale in the distance. All of those emotions are tangible again here. The sounds and the feel of locomotives, the smell of warm creosote ties and diesel exhaust, the weight and humidity in the air- these are things that we can almost sense just in allowing ourselves a few minutes to gaze at the images.

Enjoy the last days of the summer, and may your memories bring you back to the atmosphere of good times remembered!

~RGDave






Wednesday, August 7, 2019

On the Cover of Model Railroader!!!

Continuing with the theme of balance in the wake of a challenging few months, I am thrilled to announce that the Onondaga Cutoff has been featured in an article published in Model Railroader magazine! 

While I knew the article was coming, I had no idea that it was in consideration for a cover shot, and so that will live as one of the best surprises I've had, ever.  I am still in a state of shock weeks after the author copy arrived in the mail.  I'm so thankful to be able to contribute, and hopeful that perhaps somewhere a young person will see this and be inspired as I was so many times in my youth.  Coming from a non-model railroad family, this magazine was a wonderful source of excitement for me when I was able to get my hands on it. 

Regular readers will remember the article published in Model Railroad Planning ('MRP') 2018, which gave an overview of the layout and its origins.  That one got the train rolling, so to speak, and I was able to build on that momentum to develop several article concepts for the main magazine.

This article is the first of those to be published.  It is part of the September 2019 issue of MR, on the shelves now, which has several articles coordinated around the idea of running model trains over '24 hours' including simulated dusk, darkness, and dawn, as well as with the lights on.  One of the early goals for operating trains on the 'OC' was to simulate a rolling schedule on the railroad, including round-the-clock operation and the challenges (and mystique) that changing light conditions bring to prototype railroad operations.  This has proved very popular with operators on the OC, so my writing is centered on getting your room and layout surfaces lit for operations, with photos and some ideas to help it come together.   

As a subscriber for some 35 years, it's one of the life goals I have had, and now it's on the books!  Thanks for your support.  This is a wonderful hobby to share.  More to come as always, but this highlight will remain for a long, long time!


Thursday, July 11, 2019

Balance

After a memorable and exciting month of June on the Onondaga Cutoff, with an operating session ahead of a visit from Rapido Trains and subsequent video, July appeared to be much more quiet.  Summer usually allows for less layout time in any case, but also evenings allow for some time to catch up on projects. 

Well, let's just say July found a way to balance out all the positive excitement that was around in June!

Following the fun, the layout was a bit of a mess, with trains and throttles out of position after setting things up for the video shoot.  I was flying high and excited about the upcoming video, looking forward to seeing how Rapido would present the OC.  I decided to do some video of my own to pass the time.  I didn't check the main lines first - while throttles and tools were out of place, I didn't recall any fouling the main.  I chose a big manifest train from staging and a 5-unit consist to lead it.  As it passed through the hidden trackage back behind Iroquois Paper, I heard the unmistakeable sound of something plastic hitting a concrete floor.

I went over to investigate and saw the missing throttle on the floor, and next to it something we all dread: a locomotive had hit the ground.  Trucks were off, parts all over.  As I got close to it, my stomach dropped and heart raced as I saw the cab crushed, and saw for the first time which engine it was.  This wasn't just another engine.  Nope: this was my 6577, my only proper C30-7A.


Conrail rostered 50 of these based in Selkirk, NY, and they were daily across my modeled territory.  Never available commercially except in brass, and in need of several of these, I proceeded to make my own.  Regular readers will remember that this is the one with its own blog post in December 2015.  The one I researched and kitbashed and painted and detailed over 60 hours a few years back.  Not an old blue box engine with details.  Not something used only now and again.  Now it was destroyed due to my own heady haste.  This was a huge loss for our operation and the theme of the railroad.

In checking the scene I discovered what happened: the locomotives on the train I was moving ran into the throttle, which had been left on the main track above locomotive storage tracks due to my rushing around during the Rapido video shoot .  The throttle slid off the main track, falling down and knocking 6577 -of all engines- off the railroad where it fell to the concrete floor.

As you can see, the damage was extensive.  The cab was destroyed.  Details were all over the place.  The body pieces, glued together in the kitbash, were now cracked apart once again.


I was heartbroken.  What to do?  Well, the frame wasn't bent.  Mechanism went back together without too much hassle.  There's that.   And, after I had done this job, CMR Products developed and now offers a C30-7A shell in HO as a polyurethane casting.  While not up to modern injection-molding standard, with proper prep and painting, it would work for me.  Still though...all that time and effort...

After consulting with the guys closest to me on the OC, I started to think about rebuilding using the existing shell.  I had a spare cab for another project that would fit the bill.  Parts could be reused.  The shell could be carefully re-glued.  Inspired by what Conrail's Juniata shops had done, including rebuilds of several C30-7A's that were accident damaged, I decided to do the same.  

  

This would take some doing.  I cleaned up the replacement cab, modified the headlight and number board housings based on the old cab, and removed the details from the crushed cab for installation on the new cab.  I scrachbuilt flag holders and rain gutters from styrene and glued them in place.


It still is upsetting to see that perfect decal work on the old cab here, but now there is some hope at least!  Number board holes were filled with white styrene and the cab was washed.


I had a can of the same ScaleCoat CR Blue I had used to paint the original model, which was fortunate.  A coat of paint now and we are getting closer....


While that cured I refitted the loose details including steps and handrails, and I took the opportunity to install an iPhone speaker in place of the 'sugar cube' speaker I had used originally.  It makes a huge difference in sound.  I also carved a new headlight lens assembly and light tube.

In the time since I'd done this model the first time, I discovered ShellScale Decals, who do perfect Conrail GE number board decals.  These are much closer to the actual font GE used on these than what comes with the Microscale set.  


Once the decals cured, it was time to move the wipers from the old cab to the new one, and give the dullcoat treatment before window glass installation.


A bit of pastel chalk weathering helped blend the fresh cab into the weathered body.  After installing the new light package, I installed the new cab and attached the handrails.  Well, the brighter headlight and proper number board font are both big improvements.


Now completed and back ready for service, the wreck-repaired 6577 poses for a broadside at Onondaga Yard:


I'll admit that this came out better than expected.  As time goes on I'll add a little more blend to the weathering, but for now this turned out to be a successful rebuild in a situation that looked hopeless to start.  Like the real railroad, sometimes the mechanical shop guys can 'pull a rabbit out of a hat' and get something that looked pretty bad up and running again, adding to the bottom line.  

So, next time you see 6577, you'll know the full story.  

Oh - and I added a guardrail along that storage track, too.  

Enjoy your summer months!

~RGDave