Wednesday, June 10, 2015

Context, Details, and Maintenance Equipment

One of the things that working for a railroad can give you is lots of opportunity to observe the machines and people that make a railroad work - besides the trains!  While we all enjoy the trains themselves, the fact is that trains wouldn't roll if the property were not properly maintained.  Different departments work to maintain different aspects of the operation:  Track, 'B&B' (Buildings and Bridges), Signals, etc.

Scenery around the west end of Onondaga Yard has continued to progress.  With each small improvement, the context of the layout deepens.  Here's an overview of the scene at the big signal bridge supporting the westbound home signals for CP282, showing new ballast work, and the newly installed access road for the yard office:

And a quick snapshot of the signal bungalo for CP282, which has taken the place of the abandoned interlocking tower in the background:


In that first image, you can see a big knuckle-boom truck on the access road, headed towards the maintenance base that occupies some of the yard office area.  Built by my long-time buddy Mark in exchange for some weathering and DCC work, I only added some decals, window glass, and weathering to finish up his truck models for my fleet, each of which include scratchbuilt, resin-cast cabs, with kitbashed frames, wheels, and body.  

Here's a few shots of the current fleet at rest at the office.  First is a shot showing the rest of that area, which ends up being a good place to display the trucks behind the west end of the yard:


The trucks are not motorized, but are really beautiful models, with plenty of details!  Having a few of them fills a crucial role of adding important background for Onondaga Yard.  Most Conrail facilities would have a few trucks like these around, and Onondaga is no exception.  Here is a close-up of the boom truck:

 And finally, here is a close-up of the knuckle boom, the most recent and most intricate of the three models that Mark has delivered:

I am looking forward to getting more background and base scenery done, as it allows some of the real scenic detail work to begin in earnest.  All of that helps to set the feel of Conrail in the 1990's, as well as the feel of the area of Central New York that I am trying to convey.

~RGDave



Tuesday, June 2, 2015

Scenery & Close Clearances

Model railroaders always need more space.  I do, anyway.  Even where there seems to be plenty of space, we always squeeze in as much as we can, and Onondaga Yard is no exception.  Most of the Onondaga Cutoff will be built with narrower scenes than at Onondaga Yard, where I have almost 30" of space to work with between the front the fascia and the backdrop.   All that space is used by trackage in an effort to maximize capacity and efficiency at the yard itself.

This caused a bit of a challenge regarding scenery at the closest spot.  I want to model a wooded hillside behind the yard, based on what the scenery at Ram's Gulch looks like south of Syracuse where the railroad would run.   But cars were brushing against my test areas - even basic foliage requires more space than I allowed myself!  I decided a good solution would be to have a retaining wall at the tightest spot, modeled quickly from sheet styrene.


As you can see, after painting the styrene to represent aged concrete, and tracing some construction joints along the painted surface with a fine permanent marker, I simply glued the wall to the backdrop.  In the photo above I have started to fill in trees around the 'wall' which allows the hillside to look complete even where I did not have space for the trees.  Tracks here are, from right to left, the North Runner, and Park Yard tracks 4, 3, 2, and 1.  The painted backdrop above will soon be filled with foliage.  Here's a tighter view from track level:


The yard is without ballast or other details until the backdrop is complete.  Scenery is a messy process, and I want to avoid having to repair spills or damage on the ballast and track while working on the backdrop.  Here is a view west towards the Yard Office.


Finally, a quick shot from the aisle looking across the yard towards the backdrop.  Once this is filled with foliage, and then accented with the more finely-detailed 'super trees,' this scene will start to pop like the scene at CP 282 does now.  Then I can ballast the yard, add the access road and miscellaneous details, and step back to enjoy the view of long trains passing before moving on to the engine house scene!

~RGDave


Saturday, May 23, 2015

COSE at CP282

Here's a video for your enjoyment - Conrail train COSE, behind recently activated C39-8 6002, comes to the top of the grade at CP 282 south of Syracuse, NY, as it heads east towards Selkirk.



The 6002 is a beautiful model of a General Electric C39-8 locomotive that I was able to get thanks to  J. Alex Lang.  I just finished the major project of adding DCC sound and lighting to it, and the results are here for you to see!

Next up is a bunch more scenery backdrop, fitting in around springtime activities!

~RGDave

Sunday, May 10, 2015

Happy Mother's Day!

Construction of the Onondaga Cutoff would simply not be possible without the support and influence of my lovely, patient, strong, and beautiful wife Kristen.  Family comes first for us, and we feel it is the most critical and important unit in our society, and indeed in all humanity.  Happy Mother's Day to her, and to all mothers, everywhere!


Mother Nature brings flowers this time of year, and the Onondaga Cutoff is no exception; may your Mother's Day be filled with flowers of all kinds and may the peace and compassion of motherhood guide us all.


Thank you, to all the mothers in our world!

~RGDave

Friday, May 8, 2015

Just after Midnight

Warm summer nights trackside have formed some of my favorite railroad memories over the years.

Here's train ELSE (Elkhart, IN to Selkirk, NY) just after midnight, running several hours late as it arrives at Onondaga Yard on May 7, 1994.  It is passing eastbound through the plant at CP 282 before making a set out and pick up, and continuing on to its destination:


With reverence to those long nights, operations on the Onondaga Cutoff run on a continuous 24-hour schedule, which comes complete with a simulated sunset, overnight, and sunrise.  The layout has just enough lighting to make night operations possible, and more lights will be added as more scenery is completed.  Admittedly the lack of light adds complications for trains working in the yard or on darker, more 'rural' parts of the railroad, but that is in itself prototypical.  

Operators seem to enjoy the additional aspects of this, especially as it seems night time operations are rarely modeled.  The variety and challenge it presents adds to the operating experience.  Most sessions, given the 3:1 fast clock, see both daylight operations and overnight operations.  That means crews get to experience both sides of the coin, each time the railroad comes to life!

~RGDave


Tuesday, April 28, 2015

"Finishing" Touches?

Well, a scene is never really finished - there's always something that can be adjusted or added!  That said, a quick post is in order now that I have added some foreground scenery and ground cover at CP-282, to compliment the backdrop work highlighted in the last entry below.

Once the backdrop work is complete, there will be less leaning over the layout to do work, and therefore less possibility that scenery work in the foreground will be crushed or damaged.  Therefore, it was finally time to add some of that here at the west end of Onondaga Yard at CP 282!


This first shot shows the Conrail mainline with the M&E coming off the in foreground, and the abandoned ramp up to the flyover visible in the background in front of a steep hillside covered with trees.  Aside from a few details, this is how it will look for some time to come!

Compare the view below to the entry from the last session - I believe that foreground scenery makes quite a difference, but I am determined to wait so that I only have to do it once!  Here's a view looking west down the main tracks toward the west end of the railroad:


Enjoy!  Springtime is in full bloom outside here in New Jersey, and suddenly, plants are 'growing' up here on the Onondaga Cutoff.

~RGDave

Friday, April 10, 2015

Getting all 'Treed-In'

A chilly, slow spring season is underway in New Jersey, allowing me to squeeze in a few more projects before the outdoor-chore season begins.  Here's a quick iPhone shot of the current scene at CP 282, now with a nearly-complete backdrop of a steep bluff with heavy tree growth.


This scene really helps to fill in the west end of the railroad and now it's easier to imagine how it will look when complete.  Still to come here is a scratchbuilt tower to represent the prototype tower that stood as 'SJ' in Solvay, NY, as well as completed trackside scenery with static grass and sundry details for the signals and turnouts.  

As the scenery 'grows' across this area, the rest of the layout looks more and more desolate, awaiting scenery of its own!  It's the long-term view that matters, though, and this is a great hobby in that it is truly cumulative.  Every tiny effort serves in perpetuity so that little time is wasted, and each project provides a return measured in years.  That's an exciting part of why we do this!

~RGDave