Saturday, December 25, 2010
Tuesday, December 21, 2010
Modifying Switches for DCC
In this post, I want to cover a step-by-step process for modifying older 'electrofrog' or 'insulfrog' turnouts for DCC. It is my opinion that this topic has received little, if any, relevant press. Some sources say that you simply need to 'isolate the frog from the point and stock rails, and isolate the points from each other.' Some say 'be careful' or even 'buy new turnouts.' None of these offer a how-to solution on converting existing turnouts.
This project will save money for all of us building a DCC system who can find older turnouts used, or that matter, have old turnouts lying around, but not yet laid. For example, I got my 50 Shinohara electrofrog turnouts for $5 each, albeit heavily used. Regardless, this is much more cost-effective than the $25-$35 you pay for these new!
When you really sit and think about it, however, this process seems trickier than it sounds at first. I went ahead and experimented. I destroyed two turnouts in the process, but figured out a way to spend about 20 minutes work per turnout and have a good-looking, DCC-friendly machine in the end.
Turnout Basics
Frog number - anyone know how this works? There is a precise trigonometric calculation (cosecants and cotangent angles) used by American railroads, but for our modeling purposes, we can treat it like a ratio of 'rise over run' as European railroad engineers do. The 'rise' is how far the divergent track diverges per the unit length - so, therefore, the frog number is a geometric ratio of distance-to-offset. A #4 frog (or #4 turnout) therefore measures four units along the straight route, while moving one unit along the diverging route. Similarly, a #6 turnout measures 6 units along the straight for every unit diverging. So, the larger the number, the more gentle the offset, and the more gradual the turnout.
For example, a #6 turnout that is 12 inches from the points to the end of the straight route will have the diverging route be 2 inches away [(1/6)*12=2] from the straight route by the end of the turnout.
Electrically, it is no secret that 2-rail model railroads generally run on DC power, with each rail an opposite polarity. For DC railroads, then, with conventional non-DCC power, reversing the polarity reverses the current, and therefore the direction the motor spins. Turnouts complicate things because rails of opposite polarity cross at the frog. Therefore, there are two choices: a permanently-isolated frog, or a frog that changes polarity to match the direction for which the turnout is lined, with that electronic conductivity provided by the point rails closing against the stock rails. Frogs that are powered by the point rail contacts can cause problems with DCC, as a simple derailment (or out-of-gauge metal wheelset) can cause momentary contact across opposite polarity rails, which can cause quick damage to the sensitive DCC decoders. Additionally, many manufacturers made turnouts with both opposite points connected by soldered crossbars, riveted in the center to ties or the throwbar, increasing further the chance of a short.
Frog Modification
In many older turnouts, the frog is powered by way of point contact. This includes older Atlas, Peco, Shinohara (Walthers), and Micro-Engineering designs. As you can see below, there are no gaps to insulate the rails in the frog from each other - the entire frog and point rails all share the same polarity by way of point contact.
Point Modification
The key here is that the point rails need power, especially if you have insulated frogs as described above, so that there are no stalls. In some many older turnouts, the points are soldered together by means of metal crossbars, which are in turn riveted to the plastic ties or throwbar. See the photo below.
How does one isolate each rail if, by design, they are soldered together and riveted as one to the ties?
First, keeping the general alignment of the points is crucial for throw machines to align the points correctly after modification. (I screwed this up, but was able to work around it). My method was to carefully cut strips of .15" thick styrene from a sheet to fit between the ties, perpendicular to the points, and to secure these from below with small dabs of Walthers GOO adhesive on each point rail. I put two on the points, one on each end, mounting them from below, several ties from the rivets.
Once that cures overnight, I used my Dremel tool and cutting disc to cut vertically through the metal connection bars and their copper contacts beneath. This caused a mess, but thanks to the styrene strips, the points held their gauge. I used an x-acto knife to clean up the burrs caused by the cutting disc. In the photo below, see the slice in the heel-point connector bar.
Once that is complete, the addition of several more styrene strips beneath the points and two on top of the point assembly over the old connections stiffens up the modification and improves the overall look as well. Again, an overnight cure will allow all to set up well.
I test the isolation by hooking the turnout to a conventional transformer, throwing the turnout, and then checking for shorts if I bridge a point rail with the adjacent stock rail. If there are no shorts, then my isolation is complete!
Electrical Continuity
Finally, we need to make a modification to connect the now-isolated point rails to the stock rails to match their polarity, which in turn will be soldered to feeders and the bus. Since each point rail only needs to be connected to the adjacent stock rail, small 1/4" pieces of scrap brass or copper can be soldered, creating an electrical bridge (e-bridge) to the points.
Early on in this process, I invested in a resistance soldering machine, which has been nothing short of a Godsend for wiring. While a regular pencil iron works best for bus/feeder connections, the resistance machine is CRUCIAL for small, neat joints between feeders and rail, and in this case between e-bridges and point rails.
To install the e-bridges, I place the turnout upside down the work bench, then use a razor saw to remove the plastic webbing between ties. With the rail bottoms exposed, buff the nickel-silver bottom of the rails with a wire disc on your Dremel, apply a dab of flux and 1/4" piece of brass wire, then resistance-solder the wire in place. Work quickly to avoid melting and warping the nearby ties. If they do melt, use the x-acto blade or any tool to straighten them while they are soft. You can see on mine that the ties did warp a bit, but to me, that looks prototypical for a yard switch anyway. The final soldered connections are visible in the photo above with the tube of Goo above the turnout.
Paint
The bright-white styrene strips between the points will disappear if painted rail brown, and actually do a plausible job of approximating some styles of prototype throw bar. In my case, I think they even look better than the big, ugly round rivet in the turnouts as they were manufactured! Here a modified curved turnout in Onondaga Yard has been laid in place, weathered, and linked to a Caboose Industries Inc. ground throw.
All for now. Good luck, and my sincere best wishes to all through the Holidays and for a happy, healthy 2011!
~RGDave
This project will save money for all of us building a DCC system who can find older turnouts used, or that matter, have old turnouts lying around, but not yet laid. For example, I got my 50 Shinohara electrofrog turnouts for $5 each, albeit heavily used. Regardless, this is much more cost-effective than the $25-$35 you pay for these new!
When you really sit and think about it, however, this process seems trickier than it sounds at first. I went ahead and experimented. I destroyed two turnouts in the process, but figured out a way to spend about 20 minutes work per turnout and have a good-looking, DCC-friendly machine in the end.
Turnout Basics
Frog number - anyone know how this works? There is a precise trigonometric calculation (cosecants and cotangent angles) used by American railroads, but for our modeling purposes, we can treat it like a ratio of 'rise over run' as European railroad engineers do. The 'rise' is how far the divergent track diverges per the unit length - so, therefore, the frog number is a geometric ratio of distance-to-offset. A #4 frog (or #4 turnout) therefore measures four units along the straight route, while moving one unit along the diverging route. Similarly, a #6 turnout measures 6 units along the straight for every unit diverging. So, the larger the number, the more gentle the offset, and the more gradual the turnout.
For example, a #6 turnout that is 12 inches from the points to the end of the straight route will have the diverging route be 2 inches away [(1/6)*12=2] from the straight route by the end of the turnout.
Electrically, it is no secret that 2-rail model railroads generally run on DC power, with each rail an opposite polarity. For DC railroads, then, with conventional non-DCC power, reversing the polarity reverses the current, and therefore the direction the motor spins. Turnouts complicate things because rails of opposite polarity cross at the frog. Therefore, there are two choices: a permanently-isolated frog, or a frog that changes polarity to match the direction for which the turnout is lined, with that electronic conductivity provided by the point rails closing against the stock rails. Frogs that are powered by the point rail contacts can cause problems with DCC, as a simple derailment (or out-of-gauge metal wheelset) can cause momentary contact across opposite polarity rails, which can cause quick damage to the sensitive DCC decoders. Additionally, many manufacturers made turnouts with both opposite points connected by soldered crossbars, riveted in the center to ties or the throwbar, increasing further the chance of a short.
Frog Modification
In many older turnouts, the frog is powered by way of point contact. This includes older Atlas, Peco, Shinohara (Walthers), and Micro-Engineering designs. As you can see below, there are no gaps to insulate the rails in the frog from each other - the entire frog and point rails all share the same polarity by way of point contact.
To isolate the frog in any switch where the frog is not isolated, a simple cutting disc in a rotary tool (such as a Dremel) will suffice. A quick 4000-rpm slice through the 4 approach rails about 1/4" from the ends of the frog will isolate the frog.
You can then fill these gaps with styrene secured with Cyanoacrylate Adhesive, and file to the profile of the rails, or you can leave them as air gaps.
In most cases, insulated frogs do not adversely affect operation. For some extremely small-wheelbase locomotives, such as an 0-4-0 steam switcher or an industrial diesel 'critter', there may be a stall issue in higher-number (i.e., longer) frogs (#6, #8, #10, etc.), but everything else should be able to bridge the gap. In any event, most modern turnout machines (including the Circuitron (r) Tortiose machines I am using) have a power-routing double-pole, double-throw switch internal to the machine that allows for automatic power routing to the frog.
Point Modification
The key here is that the point rails need power, especially if you have insulated frogs as described above, so that there are no stalls. In some many older turnouts, the points are soldered together by means of metal crossbars, which are in turn riveted to the plastic ties or throwbar. See the photo below.
How does one isolate each rail if, by design, they are soldered together and riveted as one to the ties?
First, keeping the general alignment of the points is crucial for throw machines to align the points correctly after modification. (I screwed this up, but was able to work around it). My method was to carefully cut strips of .15" thick styrene from a sheet to fit between the ties, perpendicular to the points, and to secure these from below with small dabs of Walthers GOO adhesive on each point rail. I put two on the points, one on each end, mounting them from below, several ties from the rivets.
Once that cures overnight, I used my Dremel tool and cutting disc to cut vertically through the metal connection bars and their copper contacts beneath. This caused a mess, but thanks to the styrene strips, the points held their gauge. I used an x-acto knife to clean up the burrs caused by the cutting disc. In the photo below, see the slice in the heel-point connector bar.
Once that is complete, the addition of several more styrene strips beneath the points and two on top of the point assembly over the old connections stiffens up the modification and improves the overall look as well. Again, an overnight cure will allow all to set up well.
I test the isolation by hooking the turnout to a conventional transformer, throwing the turnout, and then checking for shorts if I bridge a point rail with the adjacent stock rail. If there are no shorts, then my isolation is complete!
Electrical Continuity
Finally, we need to make a modification to connect the now-isolated point rails to the stock rails to match their polarity, which in turn will be soldered to feeders and the bus. Since each point rail only needs to be connected to the adjacent stock rail, small 1/4" pieces of scrap brass or copper can be soldered, creating an electrical bridge (e-bridge) to the points.
Early on in this process, I invested in a resistance soldering machine, which has been nothing short of a Godsend for wiring. While a regular pencil iron works best for bus/feeder connections, the resistance machine is CRUCIAL for small, neat joints between feeders and rail, and in this case between e-bridges and point rails.
To install the e-bridges, I place the turnout upside down the work bench, then use a razor saw to remove the plastic webbing between ties. With the rail bottoms exposed, buff the nickel-silver bottom of the rails with a wire disc on your Dremel, apply a dab of flux and 1/4" piece of brass wire, then resistance-solder the wire in place. Work quickly to avoid melting and warping the nearby ties. If they do melt, use the x-acto blade or any tool to straighten them while they are soft. You can see on mine that the ties did warp a bit, but to me, that looks prototypical for a yard switch anyway. The final soldered connections are visible in the photo above with the tube of Goo above the turnout.
Paint
The bright-white styrene strips between the points will disappear if painted rail brown, and actually do a plausible job of approximating some styles of prototype throw bar. In my case, I think they even look better than the big, ugly round rivet in the turnouts as they were manufactured! Here a modified curved turnout in Onondaga Yard has been laid in place, weathered, and linked to a Caboose Industries Inc. ground throw.
All for now. Good luck, and my sincere best wishes to all through the Holidays and for a happy, healthy 2011!
~RGDave
Monday, December 20, 2010
Merry Christmas, Happy Holidays and Happy New Year!
A quick update to say that yes, I'm still alive, and all is well - the usual holiday activities are keeping me very busy and more thankful than ever for all things good in my life.
I am working on a big post regarding my turnout modification process and will have that up later this week. Best wishes to all; thanks for your patience as we come to the start of the new year!
~RGDave
I am working on a big post regarding my turnout modification process and will have that up later this week. Best wishes to all; thanks for your patience as we come to the start of the new year!
~RGDave
Wednesday, November 24, 2010
Happy Thanksgiving
To all of you, Happy Thanksgiving to your and your families - may it be peaceful and safe!
Tuesday, November 9, 2010
A Push to Finish the Yard
With the new DCC system awaiting installation, I am pushing hard to get the yard in service. Over the weekend, I finished installing the body of the yard including both ladders, all the yard tracks, and the North Runner. The last few evenings have been spent wiring it, more than 70 feeder wires so far. That's a lot of rail joints and worse, lots of joints at the back of the layout that require quite a stretch to reach! But, at long last, all that remains is to wire the feeders to the bus below the layout.
Then it is on to the engine yard, which will be its own challenge, but is considerably smaller than the yard itself.
Here is the newly-laid East End of Ononodaga Yard, with the yard tracks stretching into the distance. The main line is to the left, then continuing to the right are the south yard, north yard, and finally the North Runner. The turnout to the future engine facility is at extreme right.
It won't be this empty for long. But it will be again a few months from now, when Kristen and I hang the backdrops. With the yard in service, I will finally be able to put more cars on the railroad too, so I can start to build kits that I've had for years - which will be fun later this winter as a break from layout work!
The view of the yard from the West End is also much more enjoyable now with the yard all in place:
In the middle left of this view, you can see the unique 3-way turnout I am using to allow the North Runner to rejoin the North Yard Ladder. This saves an important amount of space, as you can see. If I needed another separate turnout for that, I would loose a track in the North Yard.
It is important to test all this trackwork before going for DCC - derailments now are a hassle but don't fry decoders! I can fine-tune all the joints, turnouts, and gaps to ensure when I plug in DCC and run the first train into the yard I don't end up with constant problems. For this purpose, I put together a train of varied cars, and run it through the yard as tracks become 'live' with feeders. This is a 25-car train, a good length for a future operation that would terminate and originate at Onondaga Yard. I took the liberty of calling this SEON, Selkirk (Albany), NY to Onondaga Yard. SD40-2 6495 leads a C30-7A into the North Runner:
Lots of fun. It will be great to populate the yard once it is all wired, and even more fun to switch the yard with a radio-controlled DCC throttle and train, while mainline trains pass at speed. Good times coming on the Onondaga Cutoff!
Then it is on to the engine yard, which will be its own challenge, but is considerably smaller than the yard itself.
Here is the newly-laid East End of Ononodaga Yard, with the yard tracks stretching into the distance. The main line is to the left, then continuing to the right are the south yard, north yard, and finally the North Runner. The turnout to the future engine facility is at extreme right.
It won't be this empty for long. But it will be again a few months from now, when Kristen and I hang the backdrops. With the yard in service, I will finally be able to put more cars on the railroad too, so I can start to build kits that I've had for years - which will be fun later this winter as a break from layout work!
The view of the yard from the West End is also much more enjoyable now with the yard all in place:
In the middle left of this view, you can see the unique 3-way turnout I am using to allow the North Runner to rejoin the North Yard Ladder. This saves an important amount of space, as you can see. If I needed another separate turnout for that, I would loose a track in the North Yard.
It is important to test all this trackwork before going for DCC - derailments now are a hassle but don't fry decoders! I can fine-tune all the joints, turnouts, and gaps to ensure when I plug in DCC and run the first train into the yard I don't end up with constant problems. For this purpose, I put together a train of varied cars, and run it through the yard as tracks become 'live' with feeders. This is a 25-car train, a good length for a future operation that would terminate and originate at Onondaga Yard. I took the liberty of calling this SEON, Selkirk (Albany), NY to Onondaga Yard. SD40-2 6495 leads a C30-7A into the North Runner:
Lots of fun. It will be great to populate the yard once it is all wired, and even more fun to switch the yard with a radio-controlled DCC throttle and train, while mainline trains pass at speed. Good times coming on the Onondaga Cutoff!
Friday, October 22, 2010
Digital Command Control
Last night, I pulled the trigger, and finally ordered the new control system for the Onondaga Cutoff: a North Coast Engineering (NCE) PowerPro 5-amp radio-control system, with an additional 5-amp booster unit, and the associated hardware. I also ordered 6 breakers designed for this system, one for each of my power districts.
Main Unit: Visible Main Line
Short Line (not yet installed)
Booster Unit: Onondaga Yards/Engine Facility
Staging and hidden mainlines
This arrangement should keep my current draw below the 5-amp maximum, even with up to 4 or 5 units pulling long trains. Both mainline tracks are wired to the same bus. A basic 'blue box' Athearn unit that is in good shape draws about 0.6 to 0.7 amps at full throttle, and most other motors (Atlas, Kato, newer Athearn) are lower, so I can run about 6-8 units at full throttle at once on any power district - even with two big trains on the main line, I should have some spare capacity.
Spending hundreds on a one-shot deal with this hobby is unsettling, but Kristen supports it and at the least this should be the last time I do this for quite a while. My first task will be to install a decoder in a few engines, then make the big switch and hook up the new control system - and a new era will begin!
Main Unit: Visible Main Line
Short Line (not yet installed)
Booster Unit: Onondaga Yards/Engine Facility
Staging and hidden mainlines
This arrangement should keep my current draw below the 5-amp maximum, even with up to 4 or 5 units pulling long trains. Both mainline tracks are wired to the same bus. A basic 'blue box' Athearn unit that is in good shape draws about 0.6 to 0.7 amps at full throttle, and most other motors (Atlas, Kato, newer Athearn) are lower, so I can run about 6-8 units at full throttle at once on any power district - even with two big trains on the main line, I should have some spare capacity.
Spending hundreds on a one-shot deal with this hobby is unsettling, but Kristen supports it and at the least this should be the last time I do this for quite a while. My first task will be to install a decoder in a few engines, then make the big switch and hook up the new control system - and a new era will begin!
Wednesday, October 20, 2010
Fall Colors...
...give me lots of reasons to be outdoors this time of year, hence the slow updates to the blog! While I will not be modeling peak fall colors, it is without question my favorite time of year and a beautiful time to be outdoors. For instance, last weekend was spent up along the Southern Tier of New York, in the valley of the Delaware River. I was able to capture a few images of the Stourbridge Railroad's excursion, with their ex-Bangor & Aroostook BL-2. As proof, here's one! :-)
Layout progress has continued, little by little, as I align the east end yard ladder tracks with the mainline turnouts at CP 280. After putting in the west end of the yard, I did not lay more than a few feet of yard track, as the alignment of the turnouts on the east end will dictate spacing of the yard tracks as they approach the east end. Once the turnouts are in, I can line everything up and secure it.
Enjoy the fall (and fall beers!) while it lasts! Plenty of time for model railroading coming soon.
Layout progress has continued, little by little, as I align the east end yard ladder tracks with the mainline turnouts at CP 280. After putting in the west end of the yard, I did not lay more than a few feet of yard track, as the alignment of the turnouts on the east end will dictate spacing of the yard tracks as they approach the east end. Once the turnouts are in, I can line everything up and secure it.
Enjoy the fall (and fall beers!) while it lasts! Plenty of time for model railroading coming soon.
Subscribe to:
Posts (Atom)